Orange County NC Website
115 <br /> i i DPI Facility Needs ■ . <br /> x„ <br /> Culbreth <br /> Middle <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ 246,440 246,440 <br /> Sewer System: L Check box to add sewer system. <br /> Water System(well): E Check box to add a well. <br /> Grading/Drainage:$ 77,000 Storm sewer repair 77,000 <br /> Canopy(cov.walk): s.f. <br /> Other Sitework (describe):$r 176,760 IMisc.landscaping and repair 176,750 <br /> Building/Exterior/Structure <br /> Roof Replacement: 105,930 s.f. X $25.14 per sq. ft. = 2,663,010 <br /> Structural Repairs:$ 294,306 Waterproofing, doors,windows 294,306 <br /> Window Replacement: s.f. <br /> Masonry/Ext.Wall.Repairs:$ 186,000 186,000 <br /> Other Bldg/Exterior(describe):$ <br /> Interior/ Finishes <br /> PartitionANall Construction:$ 5,400 5,400 <br /> Ceilings: 39,000 s.f. X $6.00 per sq.ft. = 234,000 <br /> Flooring: 44,500 s.f. X $16.48 per sq.ft. = 733,500 <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$1 443,800 ISoundproofing, repair water damage 443,800 <br /> Plumbing/HVAC/Electrical <br /> Air Conditioning: 122,467 s.f. X $25.00 per sq.ft. = 3,061,675 <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech.Wiring: s.f. <br /> Plumbing:$ 222,600 Bathroom renovation 222,600 <br /> Other Plbg/HVAC/Elec.(describe):$ 123,683 Install new panelboards&gear 123,683 <br /> Bldg. Code/Life Safety <br /> Bldg. Code/Life Safety:$ 470,400 470,400 <br /> ADA Ramps/H.C.Access:$ <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprinkler System: 114,058 s.f. X $6.09 per sq.ft. = 694,348 <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat'll Environmental <br /> Hazardous Mat].Abatement:$ <br /> Indoor Air Quality:$ 14,400 14,400 <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental (describe):$ <br /> Other Renovations(not incl. above) <br /> Other Renovations (describe)l.$ 682,080 Misc Mechanical 682,080 <br /> 2$ <br /> 3.$ <br /> Subtotal: 10,329,392 <br /> Contingency (10% of renovation cost): 1,032,939 <br /> Admin. and Design Fees (8.5% of renovation cost): 877,998 <br /> Total Renovation Cost: 12,240,330 <br /> 681-322 Culbreth Middle-3 printed:4/12/2021 Page 2 of 3 <br />