Orange County NC Website
109 <br /> DPI Facility Needs Survey Cost • Add itions/Renovations <br /> 1 Project <br /> Scroggs <br /> Renovations <br /> Site Improvements Size/Amount Notes/Description Cost <br /> Parking/Drives:$ <br /> Sewer System: Check box to add sewer system. <br /> Water System (well): F1 Check box to add a well. <br /> Grading/Drainage:$ <br /> Canopy(cov.walk): s.f. <br /> Other Sitework(describe):$1 200,000 lAthletic fields 200,000 <br /> Building/Exterior/Structure <br /> Roof Replacement: s.f. <br /> Structural Repairs:$ <br /> Window Replacement: s.f. <br /> Masonry/Ext. Wall Repairs:$ <br /> Other Bldg/Exterior(describe):$ <br /> Interior/ Finishes <br /> Partition/Wall Construction:$ <br /> Ceilings: s.f. <br /> Flooring: s.f. <br /> Painting: s.f. <br /> Other Bldg/Interior(describe):$ <br /> Plumbing/HVACI Electrical <br /> Air Conditioning: 90,980 s.f. X $25.00 per sq. ft. = 2,274,500 <br /> Electrical Service: s.f. <br /> Lighting: s.f. <br /> Computer/Tech. Wiring: s.f. <br /> Plumbing:$ <br /> Other Plbg/HVAC/Elec.(describe):$ <br /> Bldg. Code/Life Safety <br /> Bldg. Code/Life Safety:$ <br /> ADA Ramps/H.C.Access:$ <br /> ADA Toilet Renovations:$ <br /> Fire Alarm:$ <br /> Sprinkler System: s.f. I <br /> Other Code/Safety(describe):$ <br /> Hazardous Mat'II Environmental <br /> Hazardous Matl.Abatement:$ <br /> Indoor Air Quality:$ <br /> Inground Fuel Tanks:$ <br /> Radon Management:$ <br /> Other Environmental (describe):$ <br /> Other Renovations(not incl.above) <br /> Other Renovations(describe)1.$ <br /> 2.$ <br /> 3.$ <br /> Subtotal: 2,474,500 { <br /> Contingency (10% of renovation cost): 247,450 <br /> I <br /> Admin. and Design Fees (8.5% of renovation cost): 210.333 <br /> Total Renovation Cost: 1$2,932,283 <br /> 681-330 Scroggs Elementary-3 printed: 4/12/2021 Page 2 of 3 <br />