Browse
Search
Agenda - 05-18-2021; 6-a - Unified Development Ordinance Text Amendments – “160D” Legislation
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 05-18-2021 Virtual Business Meeting
>
Agenda - 05-18-2021; 6-a - Unified Development Ordinance Text Amendments – “160D” Legislation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 3:54:40 PM
Creation date
5/13/2021 3:56:18 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for May 18, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 05-18-2021 Virtual Business Meeting
OTHER-2021-026-Statement of Approval and Consistency of a Proposed Unified Development Ordinance Text Amendment with Adopted Orange County Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 262 <br /> Section 6.7:Additional Standards for MPD-CZDCD <br /> (b) The acreage of each development lot/pod may be adjusted by u o <br /> 15%, provided the acreage of the entire development site rem ns the <br /> same and a plat has not been approved for the property. <br /> (2) dways &Access Points <br /> (a) Shifts in the interior roadways/rights-of-ways shall b considered <br /> rmitted adjustments provided the following con ions are met: <br /> (i) The roadway/right-of-way is moved I s than 50 feet to either <br /> ide, <br /> (ii) Th oadway/right-of-way widt emains the same, and <br /> (iii) The roa way/right-of-way s ft does not cause a change in the <br /> location o esign of any ' tersection with a roadway exterior to <br /> the develop nt. <br /> (b) Shifts in the location of ro ay access points interior of the <br /> development shall be a r "tted adjustment, provided the number of <br /> access points remain consist t with the approved Master Plan and the <br /> locations meet all s aration req i ements established within this <br /> Ordinance. <br /> (c) All points of cess from roadways exter r to the development shall be <br /> as approv on the Master Plan. <br /> (3) Utilities <br /> (a) Sh' s in the location of utilities serving the develop nt shall be a <br /> rmitted adjustment provided the changes are consis nt with the <br /> following: <br /> (i) The proposed changes do not impact any perimeter ffers <br /> and/or setbacks established on the Master Plan. <br /> (ii) On-site stormwater ponds shown on the Master Plan that ar <br /> considered part of the buffer for incompatible uses, shall not b <br /> shifted more than 50 feet along the perimeter property boundary. <br /> Figure 6.7.2.A: MPD-GZ-CD Permitted Utility Adjustments <br /> Example _. <br /> Plan <br /> 7 <br /> 7 <br /> Shift¢50' <br /> 0 o Approved Utility Approved Stormwater Pond <br /> Permitted Utility Adjustment Revised Stormwater Pond <br /> Required Setback[Nat Adjustable] <br /> Orange County, North Carolina-Unified Development Ordinance Page 6-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.