Browse
Search
Agenda - 05-18-2021; 6-a - Unified Development Ordinance Text Amendments – “160D” Legislation
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 05-18-2021 Virtual Business Meeting
>
Agenda - 05-18-2021; 6-a - Unified Development Ordinance Text Amendments – “160D” Legislation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 3:54:40 PM
Creation date
5/13/2021 3:56:18 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for May 18, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 05-18-2021 Virtual Business Meeting
OTHER-2021-026-Statement of Approval and Consistency of a Proposed Unified Development Ordinance Text Amendment with Adopted Orange County Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 214 <br /> Section 5.12: Standards for Extractive Uses <br /> (xii) Operating practices will be followed to comply with the <br /> performance standards applicable to the operation (See <br /> Subsection 7 7 7(E)Section 6.4115) <br /> (c) A Rehabilitation Plan which shall include: <br /> (i) A statement of planned rehabilitation of the excavated land, <br /> including detailed methods of accomplishment and planned <br /> future use of the rehabilitated land. <br /> (ii) A map showing the final topography, after rehabilitation o the <br /> same scale as the Site Plan, depicting any water are and <br /> methods of preventing stagnation and pollution ther of, <br /> landscaping and ground cover proposed to be ins Iled, and the <br /> amount and type of back fill to be employed, if a y. <br /> (iii) Typical cross sections showing planned reha ilitation. <br /> (iv) A phasing and timing plan, related to the p asing and timing <br /> portion of the Operations Plan, showing a progression of the <br /> rehabilitation and the date when it will a complete. <br /> The method of disposing of all equi ent, structures, dikes and <br /> spoil piles associated with the op ations. <br /> (vi) A written legal description or s vey of the property, prepared by <br /> North Carolina registered I d surveyor or engineer. <br /> (2) Standards of Eva ation <br /> (a) The applicant emonstrates tha the extractive use operation fulfills <br /> primarily a loca eed as oppo ed to a regional need in terms of <br /> supplying sand a /or grav for building and construction purposes. <br /> (b) All operations associ ed ith extraction shall conform to the following <br /> performance standards <br /> (c) Direct illumination re ultin from the operation shall not fall upon any <br /> land not covered b the app i ation. <br /> (d) Equivalent sou levels at the undaries of the extraction site shall not <br /> exceed the fol wing standards: <br /> VIBRATION - - . . EXTRACTION <br /> - <br /> TiME SITES DECIBEL LiMIT <br /> 7:00 a.m.to 7:00 p.m. dBA <br /> 7:00 p.m.to 7:00 a.m. 58 A <br /> (e) Vibration levels at the boundaries of the extraction site sha ll no exceed <br /> the following standards: <br /> TABLE 5.12.2.A.2.E.:VIBRATION LEVEL STANDARDS FOR EXTRACTION <br /> SITES <br /> 115 Update to correction section reference. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.