Orange County NC Website
Article 5: Uses 211 <br /> Section 5.11: Standards for Waste Management Facilities <br /> (iii) Complete description of operation, including source of materials, <br /> method of compaction, type of sealing proposed, types and <br /> number of equipment to be used. <br /> (iv) Any phasing of operations and relationship among phases. <br /> (v) Operating practices to be followed to ensure compliance with <br /> applicable performance standards in Section2-7-7�E+.6_4.14 <br /> (g) A Rehabilitation Plan which shall include: <br /> (i) A statement of planned future use of the site, including det 'ed <br /> methods of accomplishment. <br /> (ii) A map, to the same scale as the Site Plan, showing fi I <br /> proposed topography, landscaping and ground cove proposed <br /> and any drainage or other structures proposed. <br /> (iii) A phased plan of rehabilitation, related to the o rations plan, <br /> showing how the rehabilitation will relate to th fill operations and <br /> the date of final completion. <br /> (2) Stan rds of Evaluation <br /> (a) I operations associated with the fill shall con rm to the following <br /> pe ormance standards: <br /> (i) Direct illumination resulting from a operation shall not fall upon <br /> ny land not covered by the ap lication. <br /> (ii) Eq 'valent sound levels at t e boundaries of the fill site shall not <br /> exce the following stan rds: <br /> STANDARDSTABLE 5.11.2.A.2.1: SOUND LEVEL .- WASTE MANAGEMENT <br /> TIME DECIBEL LIMIT <br /> 7:00 a.m. 7:00 p.m. 68 dBA <br /> 7:00 p.X.to 7:00 a.m. 58 dBA <br /> (iii) Vib t4cn levels at the boun�ries of the fill site shall not exceed <br /> th ollowing standards: <br /> I ABLE 5.11.2.A.2.11:VIBRATION LEVEL STANDARDS F WASTE <br /> OMANAGEMENT FACILITIES <br /> R <br /> State 1.0 inc s/second <br /> Impact 2.0 inches econd <br /> [1]The maximum particle velocity shall be the maximum displace ent sums of <br /> three mutually perpendicular components, recorded simultaneo ly, <br /> multiplied by the frequency in cycles per second. <br /> For purposes of this Ordinance, steady state vibrations are vibrations whi are <br /> continuous, or vibrations in discrete impulses more frequent than 60 per mi te. <br /> Discrete impulses which do not exceed 60 per minute, shall be considered <br /> impact vibrations. <br /> 114 Update to correct section reference. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-100 <br />