Orange County NC Website
Article 5: Uses 199 <br /> Section 5.10: Standards for Telecommunication Facilities <br /> ommunication support structure to an extent not commerc' <br /> imprac le; and <br /> (b) The placement, h t and quantity of wirel elecommunications <br /> towers and equipment in In a m , including but not limited to the <br /> use of stealth technology or flage techniques, to minimize adverse <br /> aesthetic and visual ' acts on the la roperty, buildings, and other <br /> facilities ad' to, surrounding, and in gen I the same area as the <br /> requ location of such wireless telecommunica ' support <br /> ructure, which shall mean using the least visually and p ally <br /> intrusive facility that is not technologically or commercially imprac' ble <br /> under the facts and circumstances. <br /> (2) Balloon Test and Neighborhood Information Meeting <br /> (a) The applicant shall, at least 45 days prior to a Class Special Use <br /> Permit pUbliG evidentiary hearing or Planning Board meeting where arm a <br /> Class o Special Use Permi+at which a Conditional District application is <br /> scheduled for review, conduct a balloon test whereby the applicant shall <br /> arrange to fly, or raise upon a temporary mast, a minimum of 10'3" in <br /> length, brightly colored red or orange balloon at the maximum height of <br /> the proposed new wireless support structure. <br /> (b) The balloon test shall be flown for at least four consecutive daylight <br /> hours starting sometime between 10:00 A.M. and 2:00 P.M. on the dates <br /> chosen. <br /> (c) A notice of the dates (including a second date in case of poor visibility, <br /> weather or atmospheric conditions on the initial date), times, and location <br /> of the balloon test shall be mailed, by certified mail, return receipt <br /> requested, by the applicant, to all persons owning property within 1,000 <br /> feet of the subject parcel no less than 14 days in advance of the first test <br /> date. The data contained within the office of Orange County Land <br /> Records shall be used as the primary source for determining which <br /> residents are to receive notice of the balloon tests. <br /> This notice shall also inform local residents that a neighborhood <br /> information meeting shall be held the day of the balloon test so that the <br /> applicant can explain the proposal and Planning staff, including the <br /> County's telecommunications consultant, can explain the SpeGial Use <br /> Dormil ro�o",n+ review process. <br /> The primary date shall be on a weekend (excluding legal holid but to <br /> revent delays in the processing of the application, and in se of poor <br /> w her or atmospheric conditions on the initial date a secondary <br /> date m be a weekday. <br /> (e) The applicant II inform the County P ning Staff, in writing, of the <br /> dates and times of est at leas days in advance. <br /> (f) The applicant shall also po sign on the subject property, and <br /> directional signs post at locatio to be determined by Planning Staff. <br /> The signs shall asure no more than ' e square feet in area and no <br /> less than f square feet in area, giving the ntact information of the <br /> Coun anning Department, the proposed date , ' es, and location of <br /> t alloon test. The signs shall be posted to meet the me time limits <br /> as provided for in the balloon test notification as stated abo <br /> (3) Submittal Requirements <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-85 <br />