Orange County NC Website
Article 5: Uses 193 <br /> Section 5.9: Standards for Utilities <br /> existing and proposed storage areas, parking and access are , <br /> topography at a contour interval of five feet, any officially de ' nated <br /> floodplains or alluvial soils. <br /> ( An assessment of the power needs for all structures on a property and <br /> the anticipated power generated by the proposed arra . <br /> (c) The proposed arrays distance from all structures Io ated on the property. <br /> (d) ans and elevations for all proposed structures nd arrays as well as <br /> de riptions of the color and nature of all exter r materials. <br /> (e) Land ape Plan, at the same scale as the si a plan, showing existing <br /> and pro osed trees, shrubs, ground cover nd other landscape material <br /> (f) A soils rep denoting the types of soil n the property including detail <br /> on the comp tion necessary to sup rt the proposed development. <br /> (2) Standards of Evaluati <br /> (a) The proposed arra shall not re uire the alteration of existing land use(s) <br /> to accommodate de lopmen . <br /> (b) All on-site utility and tra s ssion lines shall, to the extent feasible, be <br /> placed underground. <br /> (c) The height of propose arra and support structures shall not exceed <br /> the height requirem is of the nderlying zoning district where the <br /> property is located s detailed w in Article 3. <br /> (d) Individual array solar panels shall a designed and located in order to <br /> prevent reflec ' e glare toward any in bited buildings on adjacent <br /> properties a well as adjacent street rig is-of-way. <br /> (e) A clearly isible warning sign concerning Itage must be placed at the <br /> base of II pad-mounted transformers and s stations. <br /> (f) All chanical equipment, including any struct e for batteries or storage <br /> ce , shall be completely enclosed by a minimu eight (8)foot high <br /> f nce with a self-locking gate, and provided with sc ening in accordance <br /> ith the provisions of Section 6.8. <br /> (g) The applicant shall submit proof of liability insurance co ring bodily <br /> injury and property damage demonstrating a minimum co rage limit of <br /> $500,000.00 per occurrence. <br /> (h) A Type D Land Use Buffer shall be provided along any portion f the <br /> perimeter of the parcel, easement, or leasehold area located adj ent to <br /> property zoned, or otherwise utilized for, residential use except wh e <br /> such property is owned, leased or consists of other utility easements <br /> currently used for electrical distribution or transmission purposes. <br /> Existing vegetation may be used to satisfy the landscaping requirements. <br /> (C) Submittal Requirements and Standards of Evaluation for Solar Array— Public <br /> Utility(Class n SpeGial Use Per w,i+NR-CD District) <br /> (1) Submittal Requirements <br /> In addition to the information required by Section 2.79, the following shall be <br /> submitted as part of the application: <br /> (a) A site plan showing all existing structures on the property, any proposed <br /> buildings or structures that are necessary to support the proposed array, <br /> existing and proposed storage areas, parking and access areas, <br /> topography at a contour interval of five feet, any officially designated <br /> floodplains or alluvial soils. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-74 <br />