Orange County NC Website
Article 5: Uses 183 <br /> Section 5.7: Standards for Recreational Uses <br /> (b) Define and delineate emergency vehicle access points and fire anes on <br /> the property. <br /> (5) The facility owner shall work with NCDOT to complete a traffic inte ection <br /> analysis for access points along any state-maintained road or hi way to <br /> determine need for access improvements such as left turn lane or deceleration <br /> lanes. <br /> (6) The facility owner shall work with NCDOT, the State Highw y Patrol, and County <br /> fficials to address traffic management issues to coordin e acceleration and <br /> celeration lanes at approved entrance and exit point on the property during <br /> ma r events. <br /> (7) The fa ility owner shall work with NCDOT and Cou y officials to post proper <br /> signage n the property directing traffic through a ne-way ingress and egress <br /> location. <br /> (8) A litter collec ' n and recycling system shall developed throughout the <br /> grounds and a II points of egress. During vents facility employees shall <br /> remove trash fro the receptacles in a ti ly manner. <br /> (9) All new facilities sh install noise abat ment systems to ensure compliance with <br /> applicable County not a regulations. or existing facilities, the property <br /> owner/managers shall ovide a no' a abatement system to reduce sustained <br /> noise levels at the prope lines t the lowest practical level. To accomplish this <br /> goal, the owners/managers av the option of employing, either singly or in <br /> combination, any of the folio ' g: <br /> (a) Requiring all comp itio vehicles to have functional noise mufflers <br /> attached at all tim s; <br /> (b) Installing a sys m of noise b ffles, berms, or walls on the perimeter of <br /> the racetrack acility incorporat d into the design and placement of any <br /> lighting sys m and viewing stan , and/or <br /> (c) Depressi g the elevation of the rac ay track surface, or <br /> (d) Some ther innovative noise abateme system. <br /> (10) Limits on ra ing activities shall be such that no ra shall extend beyond 11:00 <br /> p.m. on Fr' ay and Saturday nights, or beyond 9:00 m. on other evenings. <br /> Practice ctivities shall not commence before 10:00 a. on any day and shall <br /> cease y 9:00 p.m. <br /> (11) All ternal lighting fixtures shall comply with Orange Cou lighting standards <br /> (S ction 6.11). <br /> (12) o storage of hazardous materials shall be permitted, except fo racing fuel and <br /> lubricants. Such material storage areas shall be enclosed and p ted and the <br /> Orange County Fire Marshal shall approve a pollution incident prev ntion plan for <br /> the storage facility prior to final occupancy permits. <br /> 3) If additional or accessory land uses are desired, the facility owner shall use a <br /> new site plan to be created outlining the location and nature of the propos d new <br /> land use, demonstrating compliance with this Ordinance. <br /> (14) The County shall approve a construction schedule to complete the items listed <br /> above. <br /> 5.7.7 Guest Ranch <br /> (A) Standards of Evaluation for ASE-CZ-CD Zoning District <br /> (1) Minimum lot size: 25 acres. <br /> (2) Application materials shall include a comprehensive groundwater study, for <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-58 <br />