Orange County NC Website
204 <br /> 2020-21 DPI Facility Needs Survey <br /> School Number: 680-308 Planned Capacity: 0� <br /> Priority: 4 Pre-K Capacity: 0 j <br /> Furnishings/ Equipment <br /> Furn./Eqpt.for Addition*: <br /> Kitchen Equipment: F1 Check to add kitchen equipment <br /> Media Center Furnishings*: Check to add media center furnishings <br /> Other Furn./Eqpt. (describe): <br /> Total Furn./Eqpt. <br /> Total Cost of Additions and Renovations: $14,295,526 <br /> Notes/Comments: <br /> 2013 facility Assessment Anticipated renovation needs are greater than local allocations under the 10 year <br /> capital investment plan CIP <br /> Justifications: (Why are these improvements needed?) <br /> 1. Building Code/ Life Safety <br /> 2. Depreciation/ Deferred Maintenance <br /> irw c School Planning <br /> NC Department of Public Instruction <br /> n r Safe and Healthy Schools Division <br /> 680-308 Cameron Park Elementary-4 printed: 4/13/2021 Paqe 3 of 3 <br />