Orange County NC Website
Article 2: Procedures 24 <br /> Section 2.2:Applications <br /> (B) If the applicant is not the owner, or sole owner, of the land, a notarized letter si ed <br /> by the owner(s)consenting to the submission of the application shall be su itted <br /> along with all required application information and materials. <br /> 2.2.2 Time rocessing of Applications <br /> The Planni Director, Planning Board, Board of Adjustment, Board of C my Commissioners <br /> and all other a orized review and decision-making bodies shall mak every reasonable effort to <br /> process, review, a act on applications in a timely manner, consis nt with the need to fully <br /> consider the applicati 's proposed impact and ensure that it is nsistent with the spirit and <br /> intent of the Orange Cou Comprehensive Plan and other a advances the public health, <br /> safety, and general welfare. <br /> 2.2.3 Burden Of Proof <br /> The burden of demonstrating that an ap i atio complies with applicable submittal, review, and <br /> approval criteria is on the applicant. <br /> 2.2.4 Form of Application and Filing Fee <br /> (A) Unless a greater nu er is specified herein r a specific review procedure, three <br /> copies of all appl' ations, including required su orting documentation, shall be <br /> submitted byi applicant. Applications detailing submittal requirements for each <br /> type of app ation are available in the Planning Depa ent office. <br /> (B) Offici responsible for accepting applications shall mainta' a list specifying the <br /> ma rials and information to be submitted with each applicatio iled. The list shall be <br /> ade available to all applicants and to any other person who req sts a copy. <br /> (C) The Planning Director is authorized to propose and promulgate admini ative <br /> regulations, including but not limited to the type and amount of data requir for a <br /> completed application, in order to implement the provisions of this Ordinance. <br /> (D) Applications must be accompanied by the fee amount that has been established b <br /> Board of County Commissioners. Application fees are nonrefundable. <br /> 2.2.5 Pre-application Conference <br /> (A) Prior to submittal of an application for review and approval of a: <br /> (1) Non-residential development, <br /> (2) Special Use Permit(SUP), <br /> (4)(3) Conditional ZGRing District (CZD), <br /> (5)(4) Major Subdivision, and/or <br /> (6)(5) Minor Subdivisions Utilizing the Flexible Development Option. <br /> The applicant shall schedule a pre-application conference with the Planning Department. <br /> (B) In preparation for the pre-application conference, the applicant shall submit a sketch <br /> plan illustrating the location, size and major design elements of the proposed <br /> development no later than five working days prior to the pre-application meeting. <br /> (C) The Planning Department may request that representatives of other public agencies <br /> be present at the pre-application conference, including, but not limited to: <br /> (1) Planning Board, <br /> (2) Building Inspections, <br /> (3) Health Department, <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-2 <br />