Browse
Search
2021-194-E-OCTS-NetPlanner Systems-Copper cabling
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-194-E-OCTS-NetPlanner Systems-Copper cabling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 3:23:32 PM
Creation date
5/12/2021 3:22:45 PM
Metadata
Fields
Template:
Contract
Date
4/15/2021
Contract Starting Date
4/15/2021
Contract Ending Date
4/16/2021
Contract Document Type
Contract
Amount
$11,358.12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:835219A9-5F20-4A66-BEOD-37F6AO5F9A58 <br /> ORANGE COUNTY <br /> CHANGE ORDER REQUEST <br /> NORTH CAROLINA <br /> Date: 14Apri12021 Project: Outside Plant Fiber Infrastructure Change Order No. 1 Department: IT <br /> Department Address: 131 W. Margaret Lane Project: 61370035-897086-30007 Contractor: Netplanner Systems, Inc <br /> Contractor Address: 1229 Perry Road, Ste 108, Apex, NC 27502 Effective date of original contract: 3March2021 (2021-160) <br /> This change order❑ increases ❑ decreases the contract time by days. Check here if no impact to contract time E. <br /> Will this change order impact the date of substantial completion? ❑ Yes ® No. If yes,the amended date of substantial <br /> completion is: <br /> Full Description of Change: From the Detention Center MDF <br /> => Provide and install (1) 25pair cat3 copper OSP backbone cable to: <br /> in Parks Operations Base (POB) <br /> in Environmental and Agricultural (EAC) <br /> =>All pairs will be terminated on an OSP protector(surge) block at each location,then extended to the existing network rack and <br /> terminated on to a new 24 port 5e patch panel. <br /> => Provide all testing, labeling, as-built, and support documentation as required per scope of work. <br /> Reason for Change: Additional work not in original contract (see above) <br /> Original contract sum: $ 307,070.14 <br /> Contract sum prior to this change order: $ 307,070.14 <br /> Amount of this change order: $ 11,358.12 <br /> Total sum of the contract including this change order: $ 318,428.26 <br /> This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, <br /> project, services, or work in any other manner. All other terms of the Original Contract remain in effect. <br /> Approved and executed this 14th day of April, 2021. <br /> Contract D``ocuS' nedby: Owner .aDocuSignedby: Archlte (�``I�yPTi .rgjained) <br /> M^�` 4/15/2021 <br /> By: esszaQ ._ By: _ By: 4/15/2021 esszuQ .. <br /> Revised 07/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.