Browse
Search
2021-185-E AMS-OTIS Elevator Company construction agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-185-E AMS-OTIS Elevator Company construction agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 2:31:41 PM
Creation date
5/12/2021 2:30:37 PM
Metadata
Fields
Template:
Contract
Date
3/18/2021
Contract Starting Date
3/18/2021
Contract Ending Date
3/31/2021
Contract Document Type
Contract
Amount
$70,020.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E2377815-D922-4567-91C8-D342867F1906 <br /> DS <br /> 1a� <br /> [Departmental Use Only] <br /> TITLE OTIS ELEVATOR <br /> FY 2021 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made and entered into this <br /> loth day of March , 2021, by and between, (hereinafter called the "Contractor"), and Orange County, <br /> a political subdivision of the State of North Carolina, (hereinafter called the "County," and OTIS Elevator <br /> Company, (hereinafter, the "Provider"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work required <br /> by this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the <br /> Contractor and Owner and in accordance with the following enumerated documents,which are made a part <br /> hereof as if fully contained herein: <br /> a. Construction Drawings prepared.by N/A (Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> c. proposal dated, 01/17/2020 which fully describes the work to be performed. <br /> Such work will hereafter be called the "Work". <br /> d. Related documents listed under Section 1 above. <br /> 3. TERM AND SCHEDULING <br /> Revised 12/18 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.