Orange County NC Website
DocuSign Envelope ID:72FCB29C-9B00-4947-BBBO-1BDBA765B810 <br /> MUTER■ CHANGE PROPOSAL FORM <br /> CONSTRUCTION <br /> Project: Orange County Skills Development Center Proposal#: 8 <br /> Contract: Project#: 2012 <br /> Contractor: MUTER CONSTRUCTION Contractor#: 73095 <br /> T <br /> Description of Change: Install additional connect track materials,Install power and data in alcove,install(2)receptacles in Nurse Training <br /> Room,Install(6)white boards,patch and paint Room 107. <br /> Summary of Contractor's Work <br /> Materials Totals Subtotals <br /> (1) Total Direct Cost of Materials $85.00 <br /> (2) Shipping and Transportation $0.00 <br /> (3) Sales Tax(7%) $0.00 <br /> (4) Overhead&Profit on materials(10%) $0.00 <br /> MATERIAL SUBTOTAL: $85.00 <br /> Labor <br /> (5) Total Labor Cost $750.00 <br /> (6) Payroll Taxes&Insurance on labor(30%) $225.00 <br /> (7) Overhead&Profit on Labor(10%) $97.50 <br /> LABOR SUBTOTAL: $1,072.50 <br /> Equipment <br /> (8) Equipment Rental $180.00 <br /> (9) Sales Tax(6.75%) $0.00 <br /> (10) Overhead&Profit on Equipment(10%) $18.00 <br /> EQUIPMENT SUBTOTAL $198.00 <br /> Subcontractors <br /> (11) Subcontractors $4,612.65 t2.70 <br /> (12) Overhead&Profit on Subcontractors(5%) $230.63 s2;9.64- $4,843.28 <br /> SUBCONTRACTOR SUBTOTAL S i'"0:3 i <br /> SUBTOTAL S6,198.84 $6,198.78 <br /> SUBTOTAL OF PROPOSAL St"S-84 $6,1 8.78 <br /> Insurances (13) General Liability and Builders Risk Insurances 1.5 % $9.21IE <br /> Bonds (14) Bonds 2 % *W4-98 <br /> TOTAL OF CHANGE PROPOSAL °"�P $6,198.74 <br /> Time Extention Requests: 0 days Schedule Activity#Affected: N/A <br /> The Contractor agrees to perform the work outlined in this change proposal for the amount specified above and in accordance <br /> with the Contract documents if the work is authorized by the Owner. <br /> Contractor's Signature: V"d W"M Date: 2/9/2021 <br /> Approval Recommended by Design Consultant: �C� Date: 2-24-202 1 <br /> Owner's Representative Approval: Date: <br />