Browse
Search
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:42:53 AM
Creation date
5/10/2021 10:33:20 AM
Metadata
Fields
Template:
Contract
Date
3/9/2021
Contract Starting Date
3/9/2021
Contract Ending Date
3/12/2021
Contract Document Type
Contract
Amount
$307,070.14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> long-term goals of potentially using the 10-inch PVC as a future fiber optic conduit. I <br /> will confirm status as we move forward. <br /> I was referring to the section from New Hill Ave to the jail site. Permits may take <br /> longer than your contract time. <br /> 14. Will the maps for the sewer line be provided an Addendum? <br /> Northrup: See Item 7. <br /> 15.Do you have any specific requirements on the fiber? <br /> Northrup: Other than what it is in the RFP and the addenda, no. <br /> 16.Will you outline all of these fiber placement details in the addendum? Just trying to <br /> figure out how we can try to build a bill of materials for the quoting. <br /> Northrup: Other than the drawings provided and any site visit requests, no. Vendors <br /> are requested to provide a total cost for each project. We have eliminated the <br /> requirement to provide materials and labor. <br /> 17.Did you say the jail at 1200 US-70 is a new build? <br /> Northrup: Yes. <br /> 18.Will this meeting recording be available and shareable? <br /> No, it will not. We will be posting an addendum with the answers to all questions <br /> received during the Pre-bid meeting. Also, vendors have an additional opportunity to <br /> submit questions by November 20, 2020. <br /> 19.Are you looking to access other spare strands of the 144 fiber cable later to branch <br /> off to other buildings at a later date? Anywhere along the 144 route? I would think <br /> direct bury would not be the way to go and have it in conduit and handholes to <br /> access and splice into the 144. <br /> Northrup: There are no specific plans other than what is stated. <br /> 20. In the downtown area, are there any existing communications conduits or duct banks <br /> running around town or near the 2 address locations to maybe head towards the <br /> sewer main available to use? <br />
The URL can be used to link to this page
Your browser does not support the video tag.