Orange County NC Website
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> 2. Just to be clear on the 144 count fiber, it is my understanding that we will be <br /> terminating 12 or 24 of the strands on each end into a patch panel, as indicated. The <br /> remaining strands would be only tested, correct? This seemed unclear on the call, as it <br /> was mentioned to terminate and test all, but only use rack space for those 12 or 24. <br /> Northrup: 144 strands between 131 W. Margaret Lane and 1200 US-70 W. <br /> A. All strands tested <br /> B. Patch panels of the LC variety. <br /> C. 131 W. Margaret to have 24 port patch panel with dedicated strands <br /> showing up in a patch panel at 1200 US-70 W. <br /> D. 131 W. Margaret to have 12 port patch panel with dedicated strands <br /> showing up in a patch panel at 300 W. Tryon <br /> E. 1200 US-70 to have 12 port patch panel with dedicated strands <br /> showing up at a patch panel at 300 W. Tryon <br /> By my count that is 36 dedicated strands of the 144 strand bundle. Thereby leaving 108 <br /> strands tested yet dark. See Campus Wide Fiber and three original addresses project <br /> and Alternate A for additional strand information. <br /> Original and Campus Wide Fiber Project. North Campus Fiber Runs <br /> Buildings DET to POB 12 strands - 6 single mode and 6 multi-mode patched at <br /> each location. <br /> Buildings DET to EAC 12 strands - 6 single mode and 6 multi-mode at each <br /> location. <br /> Alternate A Project. 131 W. Margaret Lane to Town of Hillsborough Addresses. <br /> • 131 W. Margaret to 127 N Churton Street - 12 strands single mode patched at <br /> each location. <br /> • 127 N Churton Street to 101 E Orange Street - 12 strands single mode patched <br /> at each location. <br /> • 101 E Orange Street to 105 Corbin Street - 12 strands single mode patched at <br /> each location. <br /> 3. There were several conduits mentioned during this call so I was hoping you could <br /> include mapping showing the locations of these conduits as to where they are, what <br /> size they are, and how long each conduit section is. <br /> Northrup: See Item 1 . <br /> 4. 1 would also like to ask for a scheduled site visit where the engineers from RiverStreet <br /> Networks can ride this entire route and visit each location with someone familiar with <br /> this project. <br />