Orange County NC Website
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C176F0 <br /> NetPlanner Scope of Work and <br /> S Y S T E M S, 1 N c� Technical Team <br /> Ybur Pcrtllwav to CunnectivitV <br /> A large project locate will have to be called in for this size project.The first 5000ft will take 1 week after an <br /> onsite meeting is done with the said contractor to clear for excavation.Then 3 to 4 days after said locating <br /> time per 2000 to 3000ft to be located of existing utilities. <br /> All areas of non-hard pavement will be seed and strawed and or sod placed depending on the original <br /> conditions at the time. <br /> Final red lines will be present showing the location and depths of the said facility being installed after all work <br /> and restoration have been completed. <br /> Might be needed for protect,owner provider <br /> • Equipment racks are not included in this proposal and are provided and installed by others. <br /> • Floor Cores and floor penetrations are not included in this proposal. <br /> • Overhead corridor basket tray or conduits inside buildings are not included in this proposal and is <br /> provided by the electrical contractor. <br /> • Fire sleeves are not included in this proposal. <br /> • Fiber optic jumpers are not included in this proposal. <br /> • Active Network electronics, power strips, and UPS's are not included in this proposal. <br /> The information in this document is proprietary&confidential. <br /> 12 <br />