Orange County NC Website
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C176F0 <br /> NetPlanner Scope of Work and <br /> S Y S T E M S, 1 N c� Technical Team <br /> Yow-Pcrth way to C unnecti vitV <br /> ➢ Provide all testing, labeling, as-built, and support documentation as required per scope of <br /> work. <br /> Alternate A- Fiber Optic Backbone Cabling Scope Summary: <br /> The Town of Hillsborough <br /> ➢ Provide and install (1) 12-Strand Singlemode OSP fiber between: <br /> ➢ 131 W. Margaret Lane (West Campus)to 127 N. Churton Street Police Annex) <br /> ➢ 127 N. Churton Street Police Annex)to 101 E. Orange Street(Town Hall) <br /> ➢ 101 E. Orange Street (Town Hall)to 105 Corbin Street(Annex Building) <br /> ➢ All fiber will be terminated with LC connectors in new fiber enclosures at each location. <br /> ➢ Provide all testing, labeling, as-built, and support documentation as required per scope of <br /> work. <br /> ➢ Engineering and Design & Permitting is included. <br /> PROJECT COST SUMMARY <br /> Base bid Price: $ 302,532.14 plus PPBond $4,538.00 <br /> Alternate A Price: $151,034.20 <br /> Directional Bore will be (2) 1.25 conduits along the ROW. 1 with OSP fiber optic cabling and 1 Conduit for <br /> spare for future, or damages that may occur in the future. <br /> Handboxes (HHS)will be 24x36x36 will be placed along the route accordingly. HHS will not be placed <br /> any further than 1000ft. <br /> HHs will be for storing slack and making turns along the route. HHS will hold a minimum of 50 to 75ft of slack. <br /> All HHs will have 3 to 4 inches of gravel inside as well. <br /> A locate wire will be placed along the route as well for locating the facility in the future from possible <br /> damages that may occur.The locate wire will be installed in the HHs and then grounded to a ground rod hat <br /> will be placed in all HHs. <br /> All building entrances will be done with PVC conduit to match the size of the Bore pipe being placed. All <br /> building entrances will be reviewed with said customer before they are started.All building entrances will be <br /> sealed with Hydraulic cementfor water and any type of erosion,that may enter. <br /> All concrete removed for installation will be placed back to better or like conditions. All concrete will be <br /> replaced from joint to joint. <br /> The information in this document is proprietary&confidential. <br /> 11 <br />