Browse
Search
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:42:53 AM
Creation date
5/10/2021 10:33:20 AM
Metadata
Fields
Template:
Contract
Date
3/9/2021
Contract Starting Date
3/9/2021
Contract Ending Date
3/12/2021
Contract Document Type
Contract
Amount
$307,070.14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> 39 <br /> Owner and the Owner shall make any payment due with respect to such certification as a part of <br /> his next payment after such certification. <br /> 20.6 No certificate issued or progress payment made shall constitute an acceptance of the Work <br /> or any part thereof. <br /> 20.7 The amount certified by the Designer for payment shall be ninety-five percent (95%) of the <br /> value of Work completed and materials stored since the Designer's last certification as shown <br /> on the Request for Payment, less any amounts not certified in accordance with paragraph 20.4, <br /> and this amount shall be paid by the Owner on or before the last business day of the month, but <br /> payment shall not be past due until not paid within fifteen (15) days thereafter. <br /> 20.8 After certification by the Designer that the Work is fifty percent (50%) complete, based on a <br /> determination that the Contractor's gross project invoices, excluding the value of materials <br /> stored off-site, equal or exceed fifty percent (50%) of the value of the Contract, (except the <br /> value of materials stored on-site shall not exceed twenty percent (20%) of the Contractor's gross <br /> project invoices for the purpose of determining whether the Project is fifty percent (50%) <br /> complete) and the Contractor has provided to the Owner the written consent of its sureties to <br /> the cessation of further percentage retention, the amount certified for payment with respect to <br /> subsequent Requests for Payment shall be one hundred percent (100%) of the value of Work <br /> completed and materials stored since the Designer's last certification as shown on the Request <br /> for Payment, less any amounts not certified in accordance with paragraphs 20.4 and 20.5; <br /> provided, however, that the aggregate of periodic payments shall not exceed ninety-seven and <br /> one half percent (97.5%) of the Contract Price. If the Owner determines that the Contractor's <br /> performance under the Contract is unsatisfactory, the Owner may resume withholding <br /> percentage retention from each subsequent periodic payment application up to the maximum <br /> amount of five percent (5%) of the Contract Price. <br /> ARTICLE 21. FINAL PAYMENT <br /> 21.1 If the Work of the Contractor is limited to demolition, pilings, caissons and structural steel, <br /> the remaining unpaid balance of the Contractor's Contract Price, less a sum equal to five-tenths <br /> percent (0.5%) of the Contract Price, shall be paid within sixty days following receipt of the <br /> following documents, all of which must be received before payment shall become due: (i) <br /> request for payment from the Contractor; (ii) receipt of consent from the Contractor's surety to <br /> the payment; and (iii) approval or certification from the Designer that the work performed by the <br /> Contractor is acceptable and in accordance with the Contract Documents. <br /> 21.2 Except as set forth in paragraph 21.1, within forty five days after Substantial Completion of <br /> the Project, the remaining unpaid balance of the Contract Price shall be paid to the Contractor, <br /> less an amount equal to two and one-half times the value of punch list work or other work <br /> remaining to be completed or corrected, as reasonably estimated by the Owner. <br /> 21.3 Upon Substantial Completion, the Designer shall prepare and submit to the Contractor a <br /> deficiency list identifying all portions of the Work which are known by the Designer at that time <br /> to be incomplete or defective. Within thirty (30) days of receipt of this deficiency list, the <br /> Contractor shall complete and correct all items on that list along with all other Work required to <br /> achieve Final Completion of the Work. At any time prior to completion of the period of warranty, <br /> Revised NETPLANNER v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.