Browse
Search
2021-160-E IT-NetPlanner Systems Ooutside Plant Fiber
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-160-E IT-NetPlanner Systems Ooutside Plant Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:42:53 AM
Creation date
5/10/2021 10:33:20 AM
Metadata
Fields
Template:
Contract
Date
3/9/2021
Contract Starting Date
3/9/2021
Contract Ending Date
3/12/2021
Contract Document Type
Contract
Amount
$307,070.14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> 33 <br /> 15.2 Any claim for an adjustment in the Contract Price shall be in writing and written notice of <br /> any event, action, or non-action which may become the basis of a claim shall be delivered to the <br /> Owner and the Designer within three (3) days of the occurrence of any such event, action or <br /> non-action giving rise to the claim. Such written notice is a condition precedent to the making of <br /> a claim, and such notice shall describe the basis of the potential claim with reasonable detail <br /> and clarity. <br /> A claim shall be made in writing and shall be delivered to the Designer and the Owner no later <br /> than fourteen (14) days after such notice. The claim shall describe in detail the basis for the <br /> claim, with specific reference to any provisions of the Contract Documents, by paragraph, <br /> drawing number, or other specific identification, and shall state the amount claimed and how it is <br /> calculated. If the Contractor, at the time the claim is made, is unable to state the amount <br /> claimed with accuracy, the Contractor shall so state and provide the estimated amount and the <br /> basis on which the amount is to be calculated. At the earliest date practicable, but in no event <br /> more than thirty (30) days after Contractor's notice of claim, the Contractor shall supplement the <br /> claim with an accurate statement of the amount claimed and how it has been calculated. The <br /> Contractor shall provide, in writing, in support of the claim all such explanations, arguments, <br /> data, receipts, expert opinions, or other documents or information as the Contractor deems <br /> appropriate to be considered in support of the claim. <br /> A claim may properly be rejected by the Owner by reason of the Contractor's failure to submit <br /> adequate or accurate documentation or information, except that within seven (7) days after <br /> being given notice that the claim has been rejected on this basis, the Contractor may submit <br /> additional documentation or information. No claim for a change of the Contract Price shall be <br /> considered or granted (except solely at the discretion of the Owner) unless a claim is so made, <br /> nor shall the Contractor be entitled to any increase in the Contract Price unless the Contractor <br /> has given notice and made such a written claim within the times required. The Owner shall <br /> decide, after obtaining the advice of the <br /> Designer, whether an increase in Contract Price is warranted, and the amount of such increase <br /> shall be determined as provided in paragraph 15.4 through 15.5, below. Any change in the <br /> Contract Price resulting from any such claim shall be incorporated in a Change Order. <br /> The Owner shall advise the Contractor of its decision with respect to the claim within fourteen <br /> (14) days of its receipt, or of the receipt of additional documentation or information if the <br /> absence of such has previously been the basis of rejection of the claim; provided, however, that <br /> if, in its sole discretion, the Owner deems that review or consideration of any part of the claim or <br /> any matter related thereto by its governing Board is necessary or appropriate, it shall so advise <br /> the Contractor and shall provide its decision to the Contractor within seven (7) days after such <br /> Board consideration, review or action. Any claim on which the Owner has not provided its <br /> decision to the Contractor within the applicable time period shall be deemed denied. If the <br /> Contractor is not satisfied with the decision of the Owner, the Contractor may within seven (7) <br /> days of receipt of the Owner's decision initiate the mediation process as described in Appendix <br /> A to the General Conditions of the Contract for Construction. <br /> 15.3 In determining the amount of a Contract Price adjustment, the parties shall apply the <br /> following methods, as appropriate: <br /> (A) Change in Work: The Owner and Contractor shall negotiate in good faith and attempt to <br /> agree upon the value of any change (extra or decrease) in Work prior to the issuance of a <br /> Revised NETPLANNER v2 <br />