Browse
Search
2021-160-E IT-NetPlanner Systems Ooutside Plant Fiber
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-160-E IT-NetPlanner Systems Ooutside Plant Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:42:53 AM
Creation date
5/10/2021 10:33:20 AM
Metadata
Fields
Template:
Contract
Date
3/9/2021
Contract Starting Date
3/9/2021
Contract Ending Date
3/12/2021
Contract Document Type
Contract
Amount
$307,070.14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> 30 <br /> 13.12 The Owner shall have the right to perform Work, hire and employ labor and craftsmen, <br /> rent equipment, subcontract with other parties, or do anything that the Owner deems necessary <br /> or appropriate to remedy or cure any delay by the Contractor in the progress of the Work. Such <br /> action by the Owner shall not, in any way, affect, void or limit any warranty, guaranty or other <br /> responsibility of the Contractor under the Contract Documents. Such action may be taken by the <br /> Owner only after three (3) days written notice to the Contractor. All costs incurred by the Owner <br /> in taking any such action shall be charged to the Contractor and deducted from any amounts <br /> remaining due under the Agreement. <br /> 13.13 The Contractor may be entitled to an extension of the Contract Time (but no increase in <br /> the Contract Sum)for delays arising from unforeseen causes beyond the control and without the <br /> fault or negligence of the Owner, the Contractor or the Contractor's Subcontractors as follows: <br /> a) Labor disputes and strikes that directly impact the critical path activities of the Contract <br /> Construction Schedule; <br /> b) Acts of God, tornado, fire, hurricane, blizzard, earthquake, typhoon, or flood that damage <br /> completed Work or stored materials. <br /> c) Acts of the public enemy; acts of the State, Federal, or local government in their sovereign <br /> capacities. <br /> d) Abnormal inclement weather as defined in Article 13.14. <br /> 13.14 On any day that the Contractor considers that the Project is delayed by adverse weather <br /> conditions, the Contractor shall identify in writing to the Designer and the Owner the adverse <br /> weather conditions affecting each activity, the specific nature of the activity affected, the number <br /> of hours lost, and the number of and identity (by responsibility or trade) of workers affected and <br /> shall obtain from the Designer written recognition of the delay. The time for performance of this <br /> Contract includes an allowance for a number of calendar days which may not be suitable for <br /> construction Work by reason of adverse weather. The Contract Time will be extended only if the <br /> number of calendar days of adverse weather recognized by the Designer exceeds the number <br /> of inclement weather days set forth below, and the Contractor demonstrates how this adverse <br /> weather impacts activities on the critical path of the Contract Construction Schedule. Month <br /> Number of Inclement Weather Days <br /> January 10 <br /> February 10 <br /> March 10 <br /> April 9 <br /> May 10 <br /> June 9 <br /> July 11 <br /> August 10 <br /> September 8 <br /> October 7 <br /> November 8 <br /> December 9 <br /> Revised NETPLANNER v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.