Browse
Search
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:42:53 AM
Creation date
5/10/2021 10:33:20 AM
Metadata
Fields
Template:
Contract
Date
3/9/2021
Contract Starting Date
3/9/2021
Contract Ending Date
3/12/2021
Contract Document Type
Contract
Amount
$307,070.14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> 28 <br /> will be performed simultaneously and sequentially with the performance of the Work by the <br /> Contractor. It shall be necessary for the Contractor to coordinate construction activities with <br /> such other contractors, particularly with respect to access to work areas, storage of materials, <br /> and use of elevators and other common facilities. The Contractor shall diligently and in good <br /> faith cooperate with the Owner, the Designer, and all other contractors with respect to such <br /> matters and shall regularly and faithfully attend any and all meetings called by the Owner or the <br /> Designer with respect to such matters. Any disputes between the Contractor and any other <br /> separate prime contractor with respect to such matters shall be resolved in accordance with the <br /> claim and dispute resolution procedures in the Agreement. <br /> ARTICLE 13. CONTRACT TIME <br /> 13.1 Within fourteen (14) days after receipt of the Construction Contract by the Contractor for <br /> signatures, the Project Expediter shall prepare and submit to the Designer and Owner for review <br /> and approval a preliminary progress schedule for the Work pursuant to the requirements stated <br /> in the Contract Documents. <br /> 13.2 Within fourteen (14) days after initial receipt of the Construction Contract for signatures the <br /> Contractor shall submit to the Designer a Submittal Register listing all Submittals the Contractor <br /> is required to make or proposes to make under the Contract Documents, the dates on which the <br /> Contractor proposes to make such Submittals and the dates by which the Contractor reasonably <br /> requires a response from the Designer with respect to each Submittal. The dates submitted <br /> shall be incorporated into the Contract Construction Schedule as Completion Dates when they <br /> have been approved or modified by the Owner. The Designer shall not be required to review <br /> any Submittal from the Contractor until a Submittal Register acceptable to and approved by the <br /> Owner has been submitted by the Contractor. <br /> 13.3 Not later than thirty (30) days following execution and delivery of the Construction <br /> Agreement by Owner to Contractor, the Owner shall deliver to the Contractor a Notice to <br /> Proceed. The Notice to Proceed shall state a commencement date on which it is expected that <br /> the Contractor will begin the Work to be performed under the Agreement. The Contract Time <br /> shall be measured from said specified commencement date. The commencement date stated in <br /> the Notice to Proceed shall not be earlier than three (3) days after the Notice to Proceed is <br /> served on the Contractor. <br /> If, other than by mutual agreement, said specified commencement date is more than thirty (30) <br /> days after the date of execution and delivery of the Agreement from Owner to Contractor and <br /> the Contractor believes said delay justifies an increase in Contract Price or an extension of <br /> Contract Time, the Contractor may make a claim therefore as provided in Article 14 or Article <br /> 15. No Work shall be done prior to the date specified in the Notice to Proceed. A final Contract <br /> Construction Schedule shall be submitted for approval by the Contractor, Designer, and Owner <br /> no later than fourteen (14) days after Notice to Proceed. No payments shall be due the <br /> Contractor until this schedule is approved by all parties. <br /> 13.4 The Contract Construction Schedule is a Contract Document. The Contractor represents <br /> that the Contract Construction Schedule has been reviewed in detail, that the Contractor <br /> participated in its preparation, that all of the activities which impact, limit, or otherwise affect the <br /> time of completion of the Work are shown in the Contract Construction Schedule and that all of <br /> the activities of others which impact, limit, or otherwise affect the start, duration, or completion of <br /> Revised NETPLANNER v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.