Browse
Search
2021-160-E IT-NetPlanner Systems Ooutside Plant Fiber
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-160-E IT-NetPlanner Systems Ooutside Plant Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:42:53 AM
Creation date
5/10/2021 10:33:20 AM
Metadata
Fields
Template:
Contract
Date
3/9/2021
Contract Starting Date
3/9/2021
Contract Ending Date
3/12/2021
Contract Document Type
Contract
Amount
$307,070.14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> 3 <br /> ARTICLE 1. DEFINITIONS <br /> 1.1 Agreement - The Construction Contract, these General Conditions, and any Supplementary <br /> Conditions. <br /> 1.2 AIA- The American Institute of Architects. <br /> 1.3 ASTM - The American Society for Testing and Materials. <br /> 1.4 Beneficial Occupancy— Use of the Project by the Owner after Substantial Completion, but <br /> prior to Final Completion.. <br /> 1.5 Change Order-A written order to the Contractor signed by the Owner and the Designer <br /> authorizing an addition, deletion, or revision in the Work or an adjustment in the Contract Price <br /> or the Contract Time issued after execution of the Construction Contract. See paragraph 14.1. <br /> 1.6 Completion Date -Those dates identified as Completion Dates in the Contract Construction <br /> Schedule or elsewhere in the Contract Documents. <br /> 1.7 Construction Contract—The document executed by the Contractor and the Owner to <br /> formally memorialize their consent to the terms of the Agreement. <br /> 1.8 Construction Change Directive —A written order to the Contractor signed by the Owner and <br /> the Designer directing an addition, deletion, or revision in the Work after execution of the <br /> Construction Contract, in circumstances when the parties have been unable to agree on an <br /> adjustment to the Contract Price or the Contract Time, but the Owner requests that the <br /> Contractor proceed with said addition, deletion, or revision in the Work subject to adjustment of <br /> the Contract Price or Contract Time under the procedures described herein. <br /> 1.9 Construction Manager(s) - The person(s) or firm designated as the Construction Manager in <br /> the Contract Documents, or their authorized representatives. The Construction Manager(s), as <br /> referred to herein, will be referred to hereinafter as if each were of the singular number and <br /> masculine gender. <br /> 1.10 Contract Construction Schedule -That schedule described in Article 13 hereof and <br /> identified as the Contract Construction Schedule. <br /> 1.11 Contract Documents -All of the documents that make up the Agreement, plus the <br /> Drawings and Specifications that describe the scope of the Work, plus allowable Modifications <br /> to the Contract Documents. <br /> 1.12 Contract Price - The total monies payable to the Contractor under the Contract Documents <br /> pursuant to paragraph 15.1 of the Agreement. <br /> 1.13 Contract Time -The number of calendar days stated in, or computed from, the Contract <br /> Documents for the completion of the Work, or any portion thereof. See, particularly, Article 13 <br /> Revised NETPLANNER v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.