Browse
Search
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-160-E IT-NetPlanner Systems Outside Plant Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:42:53 AM
Creation date
5/10/2021 10:33:20 AM
Metadata
Fields
Template:
Contract
Date
3/9/2021
Contract Starting Date
3/9/2021
Contract Ending Date
3/12/2021
Contract Document Type
Contract
Amount
$307,070.14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:78B556CA-0O28-4315-8EF4-948059C1C6F0 <br /> 9) Same section, can you clarify what type of information is required in the response for <br /> "Project Organization"? <br /> Elaborate on your team organization identifying the roles and responsibilities of all team <br /> members including an identification of the project manager, key personnel that will be <br /> working on the project, and the role of any proposed firms that will be part of your team. <br /> 10)Under Section 5.1, the specification calls for single mode fiber optic (SMFO) cable to <br /> have yellow jacket. Early indications from Corning on the Altos cable called out in the <br /> spec are 32 weeks lead time for the standard outdoor cable, which has black jacketing, <br /> they will not commit a lead time to custom orders. Will standard jacket color be <br /> acceptable on the SMFO cable, as long as the performance spec is met? <br /> Standard jacket color will be acceptable. <br /> 11)Same section 5.1, with the multi-mode fiber (MMFO) cable proposed to be added for the <br /> Campus wide cabling, will there be any spec details provided for the MMFO cable, and <br /> will the jacket color also be specified as other than black? <br /> No. <br /> 12) In regards to the building terminations, does or will Orange County have in place the <br /> racks and termination panels for each locations to terminate the fiber in? <br /> Standard two post racks with vertical and horizontal wire management will be <br /> provided. Patch panels will be provided and spec'd by the bidder. <br /> 13)Can the County provide any other details on the building entry points for each location, <br /> such as where on the building, and whether the entry point is aerial or underground? <br /> 1200 US HWY 70 - (see Addendum 1) <br /> 300 W. Tryon —Any entry point into that facility would be new, i.e., included in <br /> this proposal. <br /> 131 W. Margaret Lane -Any entry point into that facility would be new, i.e., <br /> included in this proposal. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.