Browse
Search
2021-156-E DEAPR-RES Carolinas LLC driveway pipe replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-156-E DEAPR-RES Carolinas LLC driveway pipe replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 10:07:57 AM
Creation date
5/10/2021 10:06:42 AM
Metadata
Fields
Template:
Contract
Date
3/5/2021
Contract Starting Date
3/5/2021
Contract Ending Date
3/9/2021
Contract Document Type
Contract
Amount
$86,300.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:3E38OE16-OEE4-4809-9C60-91 EC84F8B4C8 <br /> Revised Attachment B: <br /> Bid Proposal Form: Bid No 367-005306: Orange County Twin Creeks Park Driveway <br /> Culvert Replacement Project. <br /> Contractor agrees to furnish all materials, labor,wood and any other supplies necessary to <br /> complete the scope of work for this project. <br /> ITEM COMMODITIES/GOODS OR SERVICES PRICE <br /> 1 To replace an existing 18" HDPE pipe with a 18" Reinforced <br /> Concrete Pipe <br /> $ /5, y63. z3 <br /> 2 To replace an additional existing 18'HDPE pipe with a 6(h)by <br /> 8'(w)precast concrete culvert with headwalls <br /> Contractor agrees to furnish all materials, labor, wood <br /> Total and any other supplies necessary to complete the <br /> scope of work for the sum of: $_7 t3, 3 62,S6 <br /> TOTAL.COST <br /> Additionally,provide Unit Prices for the following: <br /> 1 Removal of unsuitable Soil and disposal off-site <br /> $ 8. Z /Per Ton <br /> 2 Rock excavation and disposal off-site <br /> $ 3 y3. 93 /Per Ton <br /> 3 Replacement of suitable soil from off-site <br /> $ •13 /Per Ton <br /> 4 #57 washed stone <br /> $ Z 3 /Per Ton <br /> • All work must be completed within 120 days of the project start date (approx.) <br /> • Contractor is willing to participate in the County's "Docusign" digital contracting process <br /> and enter into a standard contract with the County. <br /> (Sighet(ire of Contractor) - I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.