Browse
Search
2021-149-E DEAPR-S&ME Inc Fairview landill investigation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-149-E DEAPR-S&ME Inc Fairview landill investigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 11:05:56 AM
Creation date
5/7/2021 11:04:30 AM
Metadata
Fields
Template:
Contract
Date
2/23/2021
Contract Starting Date
2/23/2021
Contract Ending Date
2/23/2021
Contract Document Type
Contract
Amount
$31,848.50
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6CF06457-7118-4304-9934-67C64310797A <br /> AMW Proposal for RI—Additional Groundwater, Landfill Gas and Soil Characterization <br /> Hillsborough Dump <br /> ID No. NONCD0000483 <br /> Task Orders 483DP-15, 16, 17 and 18 <br /> S&ME Project No.4305-17-061 F <br /> Provide project management and communication with Orange County and NCDEQ. <br /> Task 483DP-18 Compile Report <br /> S&ME will compile a letter report titled Remedial Investigation—Additional Groundwater,Landfill Gas and Soil <br /> Characterization that includes the findings of the items listed above for the scope of services. The following <br /> sections and information will be included in the report: <br /> Explanation of services performed and the findings. <br /> A section concerning any variations from the work plan or the SOPS. <br /> GPS coordinates of all sample locations. <br /> Tables summarizing laboratory data compared to regulatory standards. <br /> Figures presenting sample locations and selected analytical results. <br /> Copies of original field notes. <br /> We will submit a digital copy(pdf)of the report as required. <br /> Schedule <br /> The proposed Scope of Services will be completed within eight weeks following receipt of a Task Authorization <br /> from the Unit. A proposed field services schedule is presented below. <br /> Table 1: Tasks 483DP-16 and 17—Proposed Field Services Schedule <br /> On-Site <br /> Schedule Subtask EMMM <br /> Others On-Site <br /> DP-16, Day 1 Subtask A—Utility Clearing 1 SUE Locate <br /> Subtasks A, B, and C—GW Sampling, <br /> DP-16, Day 2 LFG Sampling and Screening, 1 2 Drill Crew <br /> Background Soil Sampling <br /> DP-17, Da 1 Subtasks A and B—GW Sampling, LFG 2 - <br /> y Screening, <br /> December 17,2020 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.