Orange County NC Website
s� <br />Option chosen shall depend upon.siee conditions. cast, sound rngineer'mgjudgmem, and <br />approval by the Town Enghea. <br />5) All off -site aul or-site utilities sWll be inland per Town.Speci &otiose& Deteds; after the <br />plans are appnuved by the Town Engineer. <br />6) A perpnuel Maiatenace Fee for the proposed/upgraded sewage pump station atoll he due <br />prwr to the Town's acceptance ofd a station for ownership and mamtenne (new station), <br />oruponwmmencementofupgmdemo (upgradedstation). The Perpetual Maintenance <br />Fee SW he calcuWtd using the fomrula listed in the Town Code, and shall be per-rated <br />based on the iacrtase in eopecity of the misting Timbers Pump Starwn The pump station <br />shall be designed mW installed in with the Town Specifications & T]emilc <br />