Browse
Search
Agenda - 10-22-2001-hb2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 10-22-2001
>
Agenda - 10-22-2001-hb2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 12:44:52 PM
Creation date
8/29/2008 10:34:59 AM
Metadata
Fields
Template:
BOCC
Date
10/22/2001
Document Type
Agenda
Agenda Item
hb2
Document Relationships
Minutes - 20011022
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR <br />Project: PATRIOT'S POEJTE APARTMENTS <br />TOWN OF HILLSBOROUGH WATEWSEWER EXTENSION CONTRACT <br />APPENDIX A <br />Developer agues to satisfy the following conditions in addition to those set forth in the <br />WATERISEWER EXTENSION CONTRACT before the Town will permit the connection of <br />Improvemnts constructed for the above reinstated project to the Town water and sewer system: <br />1) The Project shall tumid of 1 Pease having a total of 240 residential unhs(Apmtments) <br />on approximately 28.22 acres The apa9nert buJdiugs shed be served by orefi <br />(mh boon) compound water metes, art an additional meter shall be installed (if necessary) <br />for a site clubhouse. The capital fatilit f shall be massed at thi prevzJm¢ fetesgee Residemial sise(518') <br />meters for the project shall be punctuated rfrom the Town at the prove" rate at the time <br />meters are purchased, plus cog for redid read capability. Larger raters shall be purchased <br />by the Developer From the Town's supplier and shall tort to the Town's meter <br />sardards, including redid read capability. The Developer span pay su capital facilities fees <br />prior to any omhe conrtruction or within 12 months from the execution ofthls agreement. <br />2) Developer sheS design, permit, gain McManus, and comlrvel ell off -site utitily <br />improvements prior to corecarding new usable utilities as described below. These facilities <br />may execute, but act Ise limited to, _b tart g .hah water lance, one sewage pump station <br />with standby power (see details listed in hem 4), 2 barnstorm) sewage face men W <br />needed), and a -inch gavity sewer to the Town's sysa Mhdmmn 8- inch dinmetal'fe- <br />r e shah be made to the Town's water and sewer systems at various locations to include. but <br />not be limited to: <br />a) Seuxr: 8 -i tio-e to proWse upgraded sewage P=P smtior. <br />b) Water: S -arch riedr to existing Town water We at O2nge Grove Road, <br />3) As For ofthe utilities work to be done for the project, the Colandal Estates apartment <br />complex sewage utilities shall be modified to direct all sewage Row ham Colonial Estates <br />to theproposcd/upgraded sewage Pun@ station for the project <br />4) Sewage service for the project tees 2 optiom: <br />(a) The exutirg Timbers MHP sewage pump station shad be upgraded to handle <br />existing flow, art additional flow &am the project and Colonist Estates <br />Apartments, and shall be upgmded to most cartml Town Specifications, <br />including, but out Fruited to, non-clog contrifttgal warps, Wetter valve vault, <br />staudess steel internals, yard hydrate, pcernment on-site standby power with note- <br />burger, SCADA telemetry, art pedometer fexeg. <br />(b) Now asest Pump station curatruded to serve the pmject, CUladal ESatess <br />Apmrrcnte, mW Timbers hdFlp, complying with cunem Town Specifcmiau, <br />with gravity sewer installed to direct existing Timbers sewage Flow to the new <br />smtlort and abatdomnent oftbe existing Timbers sewage pump station. <br />
The URL can be used to link to this page
Your browser does not support the video tag.