Browse
Search
Agenda - 10-22-2001-hb2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 10-22-2001
>
Agenda - 10-22-2001-hb2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 12:44:52 PM
Creation date
8/29/2008 10:34:59 AM
Metadata
Fields
Template:
BOCC
Date
10/22/2001
Document Type
Agenda
Agenda Item
hb2
Document Relationships
Minutes - 20011022
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5q <br />C. Cowtiuefon Comlituns. <br />I. Unless otherwise provided or this Contract, ao construction shall be in accordance <br />with Town policy, standards and spoeifications. <br />a) The Town shall sn"guene the scra arW type of material for all water and <br />sewer Wes. <br />h) AH work shell be subject to inspection "c Town. No fine may be <br />overal up until such inspection has taken place and ifatry We or IacHity <br />is covered up prior to inspection, the Town hery quire such Hne or <br />ficility to be uncntmred or exposed to view at the developer's mmetsse to <br />faciWate such Inspection- <br />0) The Town will gaire auy testing to determine that the work w np lUwi <br />with Town standards and specdcations. All such testing shill be at We <br />Developers exp reso. <br />d) The Developers Engineer shall provide construction stake out anci <br />supervision. <br />e) An Engineer's representative slWl be prone each day that work is <br />performed and shall prepare daily logs to be subasitted weekly to the - <br />Town Engirvo. <br />Alt conaraction shall be performed by a contractor licensil to perform <br />this type of work in North Cara[ma <br />g) The Contractor shalt have a field superintendent onsite at of times during <br />construction. <br />2. The Developer shall bear the total cost of all water and/or sewer construction <br />within the Pmjcet and the total cost of all water hall sewer construction <br />rhquired toe tend service or the project. <br />D. Lost Construction Corditions: <br />Be ore the Town will allow water to How to the project ar permit use ofthe Town sewer <br />system to serte the project, Developer shall: <br />1. Furnish the Town two Copies of the record drawings, together with: <br />a) the corAraztoes andavit tut the drawing auwately represent the an-built <br />impmvertents, arW <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.