Browse
Search
Agenda - 10-22-2001-hb2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 10-22-2001
>
Agenda - 10-22-2001-hb2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 12:44:52 PM
Creation date
8/29/2008 10:34:59 AM
Metadata
Fields
Template:
BOCC
Date
10/22/2001
Document Type
Agenda
Agenda Item
hb2
Document Relationships
Minutes - 20011022
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,tllylfa / rl <br />)s <br />7�,f <br />August 28, 2000 <br />Mr. Eric Peterson <br />Hillsborough Town Manger <br />PO Box 429 <br />Hillsborough, NC 29218 <br />Deno Mr. Petemnn, <br />My name is Chns Dunbar, mrrunercial real eseate developer from High Point, NC, and I <br />represent the Falk Emily who wishs to have property, re -zo std and appeared into the <br />TownofHillsboroughbywayofassteffhevutexntion. Thepropettyiskundedby <br />Interstate 85, Interstate 40, and Orange Grove Road Tk propary consists of5 ppcols <br />and totals 52 acres. The Falk family wishes to develop an upscale multi -%milt' project <br />on this property. Feasibility studies show that Gip area lucks rental housing that is so <br />important to the economic health of Bee area <br />As background, the Falk family has owned real retire in Orange County dating back to <br />1967 when they established Falk Fabrics, a Hillsbomueh based texWe mantifactmer. <br />Comcideninlly, Falk Fabrics contributed a substantial sum ofmmies toward the <br />construction of the initial municipal water system. Tk company later contributed funds <br />used to build the sewage treatment plant as crap. The 20F000+ square bat building was <br />used by Falk Fabrics until 198 5 when the manufacturang assets were sold. The building <br />was hater leaaed to Flynt Fabrics which mcently amounted their inierrt to close the <br />facility. The Falk family and l are curwargy, looking st ways to utilize this buiLding going <br />forward to the mutual benefit of the Town and the Emily. <br />I have reviewed our pslimimry devebpmem pham with Knnny Keel, Town Engineer, <br />who her confirmed that water & wi corporally ie available W the site. Din project will <br />pay for significant improvements to the sews system that is already needed due to as <br />advanced age aal design These upgrades will reduce the Town's expense aasocwtM <br />with the maintetance aM repast oftk system. <br />Tha fuancial impact of this development is significant to tlac town ofHillsbomugh. Far <br />instance, we Peti rson But Pbaee I of the project to have m estimated value of <br />516,000,000. Annually, tidsvalue will generate mar dollars Wtk Tavw (0mvge Cowry <br />tax excluded) in the was unt of 199,200. ALSO, the estimated impact fees for water and <br />veer Por We connmctlon ofthe couriers will geurrare another $184,800 (6' miler). <br />The amnd usage lees Bom our tourist's water and sewer seMCeer will generate <br />$184,8 matdy $1 with an ($58/mh per mouth). gfa rwrad in the meantof$receive <br />($99,200 art pra with an avrwalpevenuss BoivgforwardThe amountorencedsua <br />reseiv00 by Town tax +$1antial waterlsewerspond.Thaakvercf need sums <br />received by the Tawnare substantial with few corresponding expenses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.