Browse
Search
Agenda - 05-04-2021; 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 05-04-2021 Virtual Business Meeting
>
Agenda - 05-04-2021; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 2:27:54 PM
Creation date
4/29/2021 2:33:54 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for May 4, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 05-04-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> FY2021-22 Recommended County Projects <br /> Phillip Nick Waters Building Remediation-$685,193 <br /> (p.40) <br /> —HVAC and sprinkler rnodi5cationsin warehouse <br /> 1 <br /> 2 <br /> 3 Commissioner Greene asked if this building is where the county morgue is located. <br /> 4 Travis Myren said yes, the morgue is located in the back corner and some protective <br /> 5 walkways have been put in place so people can walk to and from the morgue. He resumed the <br /> 6 PowerPoint presentation: <br /> 7 <br /> FY2021-22 Recommended County Projects <br /> • Phillip Nick Waters Building Remediation-$685,193 <br /> (p.40) <br /> —Office building remed iation and new HVAC systems completed in <br /> FY2020-21 to solve indoor air quality <br /> SS million through budget amendments <br /> —WarehauseProJeci <br /> storage olemergency rcepome equlpmenb ambulance supphee,personnel <br /> preteclive equipment,basic neceseilyaloclydee <br /> • storage has been aceanmcdated In other County owned and rented syace <br /> i natal air hanging anna to manage heat and humidity <br /> Modify sprimider system to meet code requirements for high bays <br /> ORANGnlE, nCOUNTI' <br /> 8nn.lrvn <br /> 9 <br /> FY2021-22 Recommended County Projects <br /> Phillip Nick Waters Building Remediation-$685,193 <br /> (p.46) <br /> — Project Offsets <br /> • ceearcro,recdmmnnhyC.—e h—..$lta.szt <br /> • Ptanning tundt,for Errand Ctrc�Community Center e;yamion-5100,0ao <br /> • RlstoAc courthouse aievasormodemlratlon•slss,ees <br /> Totel o9seta-E403.514 <br /> • 4et—borrowing-E281,579 <br /> ORANGE <br /> rrE COUNTY <br /> 10 <br /> 11 <br /> 12 Travis Myren said the Historic Courthouse elevator modernization should have been <br /> 13 pushed off anyway to align with other projects at the building. <br /> 14 Commissioner Bedford asked about status of projects at Cedar Grove, and the sewer <br /> 15 work, in particular. <br /> 16 Steve Brantley said the project is nearly finished and will be done within the next couple <br /> 17 weeks. He said the approach taken will work without replacing the whole system. <br /> 18 Travis Myren said there is a septic system replacement in 2024-2025 if replacing the <br /> 19 pipe is insufficient. He resumed the PowerPoint presentation: <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.