Orange County NC Website
Revisions that Modify Current Practices 12 <br /> (cont ., ) <br /> • Two new "Conditional Districts" are proposed to be added to the UDO to <br /> replace both the CUD and Class A SUP process. <br /> • R-CD for residential projects and NR-CD for non-residential projects. <br /> • Elimination of the CUD results in a reorganization (and simplification) of how <br /> major subdivisions are defined in Article 7 and the review process used. <br /> • Currently: 5 categories of major subdivisions <br /> • Over 20 lots requires Class A SUP or Conditional Use District, depending on number of lots <br /> and urban/rura designation <br /> • Proposed: 2 categories of major subdivisions <br /> • Over 20 lots requires one of the new conditional districts <br /> • Amendments endeavored to keep existing approval boards and existing <br /> processes in place to the greatest extent feasible while conforming to <br /> statutory requirements and best practices. <br />