Browse
Search
Agenda - 05-04-2021; 5-b - Unified Development Ordinance Text Amendments – “160D” Legislation
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 05-04-2021 Virtual Business Meeting
>
Agenda - 05-04-2021; 5-b - Unified Development Ordinance Text Amendments – “160D” Legislation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 2:10:13 PM
Creation date
4/29/2021 2:33:48 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for May 4, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 05-04-2021 Virtual Business Meeting
ORD-2021-011 An Ordinance amending the unified development Ordinance and 2030 comprehensive plan of Orange County
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: Subdivisions 297 <br /> Section 7.13: Specifications for Plat Drawings <br /> c) The date of preparation, <br /> (d) The Parcel Identification Number(PIN) number(s he lot(s)subject to <br /> application, <br /> (e) The pr sed property lines for each I <br /> (f) Common Op e Space lots, incl ng type and acreage, <br /> (g) A Site Analysis Map fined in UDO 7.13.2 (A)(3) below, <br /> (h) The delineation o ny kno and required stream buffers on the <br /> proposed lot <br /> (1) The osed method for ingress an ress including a description of <br /> each lot will be afforded access, <br /> 0 A narrative detailing the development of all prop ed roadways, <br /> (k) A private road justification, if required under Section 7. and <br /> (1) Any other reasonable relevant information. <br /> (B) Final Plat <br /> Final plats shall adhere to the specifications contained in Section 7.4-413146 3 <br /> 7.13.2 Major Subdivisions <br /> (A) Concept Plan <br /> (1) In General <br /> (a) The required Concept Plan for Major Subdivisions con ' is of three <br /> parts: <br /> (i) A Site Analysis Map; <br /> (ii) A Conventional Subdivision Option- nd <br /> (iii) A Flexible Development Optio <br /> (b) Concept Plan shall be prepare according to the"four-step" process <br /> for d ' ning Flexible Developm t subdivisions, as described herein. <br /> (c) The Conc Plan shall be awn in black ink or pencil to a scale of not <br /> less than 200 et to the ' ch. The scale chosen shall be large enough to <br /> show all required ta' clearly and legibly. <br /> (2) Required General Infor do <br /> Each Site Analysis M and Develo ent Option shall contain the following <br /> general informatio : <br /> (a) A sket vicinity map showing the to ion of the subdivision in relation <br /> to t existing street or highway system; <br /> (b) he plotted boundaries of the tract from deed r maps of record and the <br /> portion of the tract to be subdivided; <br /> The total acreage to be subdivided, including tax map, ock and lot <br /> number reference; <br /> (d) The name, address and telephone number of the subdivider or ner <br /> and the person responsible for the subdivision design; <br /> (e) Scale, approximate north arrow and date of plat preparation; and <br /> (f) Name of subdivision. <br /> 146 Correct reference. <br /> Orange County, North Carolina—Unified Development Ordinance Page 7-61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.