Orange County NC Website
Article 2: Procedures 80 <br /> Section 2.26:Appeals <br /> (2) The appeal to the Superior Court must be filed from the date of adoption of said <br /> Ordinance within the prescribed period below: <br /> (a) 60 days in cases involving the appeal of an Ordinance amending the <br /> Zoning Atlas, <br /> (b) 1 year(365 days) in cases involving the appeal of an Ordinance <br /> ameRdmeRt the UDO, <br /> (c) 3 years (1,035 days) in cases involving an appeal based on an alleged <br /> defect in the adoption process of an Ordinance amending the UDO. <br /> 26.6 Water Supply Watershed Critical Area Boundary Line <br /> \Regulations <br /> ations disputing the Planning Director's decision regarding the location of a ater <br /> shed Critical Area boundary line shall be accompanied by: <br /> survey prepared by a North Carolina registered land surveyor or profe ional <br /> ngineer depicting the differences between: <br /> The locational criteria in Section 4.2, <br /> The official Watershed map on file in the Planning Departm t, andThe boundary line the applicant asserts is correct.de iled explanation describing the differences in the th e boundary linesontai d in (A)above. <br /> 2. tions <br /> (A) Any property o ner who has received an order take corrective action in <br /> accordance with ection 9.7 may appeal the der to the local elected governing <br /> body by giving noti of appeal in writing to a Floodplain Administrator and the clerk <br /> within ten business d s following issuan a of the final order. <br /> (B) The local governing bod hall hear a appeal within a reasonable time and may <br /> affirm, modify and affirm, o evoke a order. <br /> 2.26.8 Soil Erosion and Sedimentation Control <br /> (A) Appeal of Erosion Control Ian <br /> Except as provided in subse on (D) belo the appeal of a disapproval, approval with <br /> modifications, or approval ith conditions of Erosion Control Plan shall be governed <br /> by the following provisio : <br /> (1) The disappro I of, modification of, or con 'tions of approval attached to any <br /> proposed sion Control Plan by the Erosio Control Officer shall entitle the <br /> person s mitting the plan to an appeal of the cision to the Orange County <br /> Planni Director. <br /> (2) If th Planning Director upholds the decision, the pe on shall be entitled to a <br /> p lic hearing if such person submits written demand r a hearing within 15 <br /> ays after receipt of written notice of disapproval, modific tion, or conditions of <br /> approval. <br /> (B) Hearings <br /> 1) Orange County <br /> (a) This sub-subsection pertains to appeals for land-disturbing a ivities <br /> occurring outside the corporate limits of the Towns of Chapel <br /> Carrboro, and Hillsborough, and the City of Mebane. <br /> Orange County, North Carolina-Unified Development Ordinance Page 2-82 <br />