Orange County NC Website
Article 2: Procedures 37 <br /> Section 2.6: Floodplain Development application Permit and Certificate Requirements <br /> (G) Copy of all other Local, State and Federal permits required prior to floodplain <br /> development permit issuance (i.e. Wetlands, Erosion and Sedimentation Co ol, <br /> Riparian Buffers, Mining, etc.); <br /> (H If the application is for placement of recreational vehicles and/or tem rary <br /> structures, documentation to ensure compliance with Section 6.2 )(5) and (7) of <br /> t ' Ordinance. <br /> (1) If a w rcourse is proposed to be altered and/or relocate , a description of the <br /> extent of tercourse alteration or relocation, an en <br /> ring report on the effects of <br /> the propose roject on the flood-carrying capacity the watercourse and the effects <br /> to properties to ted both upstream and downstr m; and a map, drawn to scale, (if <br /> not shown on plot n) showing the location the proposed watercourse alteration <br /> or relocation. <br /> 2.6.3 Data Requirement <br /> The following information shall be provided minimum on the floodplain development permit to <br /> ensure compliance with this Ordinance. <br /> (A) A complete descriptioDdf all the develop nt to be permitted under the floodplain <br /> development perms e.g. house, garage, poo , septic, bulkhead, cabana, pier, bridge, <br /> mining, d red gin filling, grading, paving, excava i n or drilling operations, or storage <br /> Of equipment materials, etc.). <br /> )Z"Zndan <br /> The SF determination for the proposed development r available data specified <br /> in Se on 1.1.3 of this Ordinance. <br /> Tegulatory flood protection elevation required for the referen level and all <br /> attet utilities. <br /> The regulatory flood protection elevation required for the protection of al ublic <br /> utilities. <br /> All certification submittal requirements with timelines. <br /> A statement that no fill material shall encroach into the floodway or non- <br /> encroachment area of any watercourse, if applicable. <br /> (G) If in an AE zone, specify the minimum foundation opening requirements. <br /> (H) State limitations of below BFE enclosure uses (if applicable) such as, parking, <br /> building access and limited storage only). <br /> (1) (H)(1) A statement indicating that all materials below BFE and/or Regulatory <br /> Flood Protection Elevation (RFPE) must be flood resistant materials. <br /> 4 Certification Requirements <br /> An Elevation Certificate (FEMA Form 086-0-33) <br /> (1) required within 7 calendar days of establishment of the r ence level <br /> elev ' <br /> (2) It shall be the f the permit holder to s it to the Floodplain Administrator <br /> a certification of the e on of the rence level, or flood proofing elevation, <br /> whichever is applicable, in re ' to NAVD 1988. <br /> (a) Said certific all be prepar , or under the direct supervision of, <br /> a Nort arolina licensed professional Surveyor or Professional <br /> sneer and certified by them. <br /> Any work done within the 7 day calendar period and befo bmission <br /> of the certification shall be at the permit holder's risk. <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-16 <br />