Browse
Search
Planning Board - 050521
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2021
>
Planning Board - 050521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 1:44:24 PM
Creation date
4/28/2021 1:21:03 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Planning Board - 050521 Training Agenda
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2021
Planning Board minutes - 050521
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52 <br /> The following items were discussed at the meeting: <br /> 1. Neighbors said they would like high speed internet. They asked if we could make the request and <br /> try to get ATT or Spectrum high-speed/ fiber optic to Emily Lane. <br /> 2. Neighbors requested that no pedestrian or vehicular access be made to the greater Emily Lane <br /> neighborhood. <br /> 3. Wells—aquifer—will the new wells affect the water table for wells on and around Emily Lane. A <br /> few wells in the neighborhood have low yield already. <br /> 4. One neighbor on Jones Ferry Road near the proposed entrance is looking forward to having the <br /> new subdivision roads to walk in where it will be safer than walking on Jones Ferry Road. <br /> 5. What will be the price point of the proposed homes? <br /> 6. Is there any way to ask the NCDOT to post a lower speed limit than the current 55 mph for Jones <br /> Ferry Road? <br /> Developer Response: <br /> 1. We will continue to make the request and work with ATT or Spectrum to bring high speed internet <br /> to the Emily Lane neighborhood through the proposed Morgan Ridge Subdivision. ATT and <br /> Spectrum have indicated that they will carry their service to Emily Lane in an easement being <br /> proposed. The HOA president for Emily Lane is talking with these utility providers. <br /> 2. There is no plan to connect to Emily Lane and there is no access currently. No connection <br /> (pedestrian or vehicular) can be made without approval of all Emily Lane residents since Emily <br /> Lane is a private road. <br /> 3. We have proposed a community well+ distribution for the subdivision. The main proposed <br /> community well near the community clubhouse is approximately 2000 feet away from the <br /> common property boundary with the closest existing neighbor. A second well must be provided <br /> (which is shown closer to the existing neighbors). Two wells are required for a community system <br /> serving more than 49 homes. <br /> 4. Yes, it seems like a positive result for many. <br /> 5. The price of the homes will probably start in the $500K's and the average size of the homes will <br /> probably be about 2600sf—2800sf. <br /> 6. We can ask NCDOT to review this issue but we don't expect any revision to the speed limit for <br /> Jones Ferry Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.