Orange County NC Website
The Master Plan Wark Group would then develop the details o£ the phasing <br />of the airs development and the apeaif~c design of the fanility, within rho snppa <br />and charge co~istent with the Hoard of Commissioners' principles. <br />An example of operating principles the BOCC Work Group might recommend <br />to the Beard of Commissioners nnuld include: <br />The operation, muintenn^"^ and programming of active recreation <br />facilities (who does it, when, Low is H maintained and by wham) <br />The use of xensevping (mtive vegetation and minimal water ass) [br <br />rill of park <br />That rill portions of the perk not identified £or playing fields should <br />adhere to O1msLead~etyle park design (open apacee, meadows, Selde <br />6exibly used for a variety of public leisure uses- such as Central Park <br />in NYC) <br />Other principles that ensum Lhat educatia~l Facilities and perk <br />enities are intertwined and Lave a seamless travsitinn, as passible <br />Others <br />The Master Plan Work Omu <br />As stated above, in this scenario, the Master Plan Work Gmnp would use the <br />di[ectioq primary uses vnd principles tom LLe Hosed of Commissioners to <br />focus efforts on the details of how schools and the park work Wgether, where <br />erdtiea such as piunin amna vnd restmame arc located, lighting, and other <br />specific details of the site design in accord with tls pmlimimry deeigv <br />concepts. <br />As members, the Meeter Plan Work Group might include: <br />• 2 County Commiasionexa <br />• 1 Carrbaro Alderman <br />• 1 School Hamd member <br />2 Citizons who live near the Bite <br />• 1 Commission for the F.nviionment Memher <br />L21P Wark Gmup members (pexhnps From Carrbaro n~ County) <br />• Duke Forest Mvnvger <br />• Other? <br />To arcamplish the Master (oonrept) Plan work, the new Open 6pece Design <br />Specialist (position appmecd in escrow Gn 1/1101) or a u~neultant would be <br />needed to work on site design and pahsing. <br />