Browse
Search
Agenda - 10-22-2001-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 10-22-2001
>
Agenda - 10-22-2001-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:10:26 AM
Creation date
8/29/2008 10:34:55 AM
Metadata
Fields
Template:
BOCC
Date
10/22/2001
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20011022
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INITIAL DRAFT <br />Possible Outline of Master Plan Process <br />Chapel Hill Township Park and Educational Campus <br />Angnat z~, znol <br />The fallowing is staffs initial attempt Woutlive n decision-making process £or <br />this rite. This may or may not be the appropriate process W be used, pending <br />the &~ard's discueaion. <br />1 Form BOCC Work G.vup W diacuas uses, July-September, 2001 <br /> guiding pr;vi pies for site and planting <br /> orocese <br />2 Recommendations from Work Group an Ocober, 2001 <br /> Cnviceptual Site Plan, Neater Plmmmg <br /> Process and Guiding Prin©Plee (basi <br /> for the Bite, general location far said naafi <br /> einci lee <br />9 Heard of Cammiss' ners deliberations oa November-December, <br /> Work Grou re art 2001 <br />3 A Master Plav Work Group is created and January -June 2002 <br /> meets W develop details of the Msater <br /> Pheaiv Plan for the site. <br />9 Master Plan Work Group August, 2002 <br /> mendations resented W BOCC <br />A BOCC Ucliberntians, Proposal for Pbase I 6eptember, 3002 <br /> cf Park/Cam u <br /> Detailed bite Plans (engineering detail) October-Navembex 2002 <br /> ure m ared Pox PhaseI <br />fi Canboro Conditional Use Permit Process November 2002 -April <br /> foe both Phase I vnd overall Msater Plan 2003 <br />7 Tentative Phase I Construction May 2003 -Apri12004 <br />Ocmbaz 2001 Aeport from BOCC Wark Grouv <br />This report would set a strong framework end outlive parameters for the <br />aster nlan process. Iv this attavgement, the Boaml of Cpmmiseiomrs would <br />defno pxpectatinas and direction of the Master Plan work ~ defining all <br />primary Dees vvd the locakorw of uses, including the type of sehooleleehool <br />farvlitiea, what type of playing fields, what type nP major park amerutiee <br />peeving the emallex details for the Msater Plav work group). <br />
The URL can be used to link to this page
Your browser does not support the video tag.