Browse
Search
Agenda - 10-21-2003-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 10-21-2003
>
Agenda - 10-21-2003-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:12:43 AM
Creation date
8/29/2008 10:34:54 AM
Metadata
Fields
Template:
BOCC
Date
10/21/2003
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20031021
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-139 Growth Management System - Amendments to Zoning and Subdivision Ordinances
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY CAPACITY (LOS `D') <br /> <br />Subdivision <br />Subdivision Rural Road Subdivision <br />Road Urban Road <br /> <br />Size <br />Traffic 2-lane <br />2-lane 3-lane <br /> 8,000 <br />12,000 16 000 <br />' <br />20 200 2.5 1.7 1.3 <br />40 400 5.0 ;:..3 2.5 <br />80 800 10.0 6.7 5.0 <br />The impact of projects with over 5% traffic increase above total capacity comports to significant <br />changes warranting the additional review through the subdivision and zoning process. <br />The proposed Growth Management System promotes subdivision analysis, specialized <br />standards review, and design at scales consistent with arural/agricultural character or urban <br />character depending upon geographic location within the County. <br />In addition to putting forth growth regulations that manage the size and location of projects, this <br />proposal includes additional land development performance standards based on the scale of <br />the project. In essence, the larger the project, the more complex research and analysis are <br />necessary to ameliorate the potential impact of the project. <br />Scale could also involve acreage consideration but the variability is more dependent upon land <br />use density conditions that could be better managed by Comprehensive Plan guidance that will <br />eventually compliment these zoning and subdivision regulations. <br />This proposal provides a tiered subdivision review process based on the location and the <br />number of lots proposed. <br />II BOCC/PB JOINT PUBLIC HEARING <br />The County Commissioners and Planning Board conducted a Joint Quarterly Public Hearing on <br />the proposed Growth Management System Amendments on Auguste 25, 2003 at the F. Gordon <br />Battle Courtroom. A Powerpoint presentation was conducted followed by questions from the <br />BOCC and PB. The public was present but did not comment or ask questions. <br />III PROCESS CHANGES -SUBDIVISION REVIEW <br />The basis of the subdivision process changes is a differentiation between urban and rural <br />designation areas and the associated and relative impacts that occur based on project lot size <br />in a specific location. <br />Although various options of rural/urban designation areas were presented at the public hearing <br />for perspective, the suggested version was Option 1. Option 1 included a 13.2 square mile area <br />as the `Urban Designation', which is comprised of the existing 10 and 20-year Comprehensive <br />Plan Land Use Element transition areas, which are within the adopted Water and Sewer <br />Management Planning and Boundary Agreement Map. The rest of the County is designated <br />`Rural'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.