Browse
Search
Agenda - 10-21-2003-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 10-21-2003
>
Agenda - 10-21-2003-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:12:43 AM
Creation date
8/29/2008 10:34:54 AM
Metadata
Fields
Template:
BOCC
Date
10/21/2003
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20031021
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-139 Growth Management System - Amendments to Zoning and Subdivision Ordinances
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance as recommended by Administration ATTACHMENT 5 26 <br />of service impacted by the development. The traffic <br />impact study shall be prepared. in accordance with the <br />requirements of Article 13. <br />8.8.29.2 Standards of Evaluation <br />The following specific standards shall be used in deciding on <br />an application for this use: <br />a) The project meets all applicable design standards and <br />other requirements of the Zoning Ordinance and the <br />Subdivision Regulations. <br />b) The project meets all service provision criteria as set <br />forth below: <br />(1) Fire -identifies the primary and secondary <br />responders and the source(s) of water. <br />(2) Police -identifies the primary and secondary <br />responders. <br />(3) Rescue services -identifies the primary and <br />secondary responders. <br />(4) Water Supply -source and capacity of water <br />supply. <br />(5) Wastewater Treatment Methods -provider and <br />capacity of wastewater treatment source. <br />c) Habitats shall be identified and evaluated in the <br />biological inventory required by 8.8.29.1B (a) and are <br />subject to the following: <br />(1) An undisturbed buffer is required around the <br />boundary of habitats of rare, threatened, or <br />endangered species as shown on the biological <br />inventory. Buffer width shall be determined by <br />site evaluation in consultation with the <br />applicant's biologist and County staff; <br />(2) Habitat enhancements as described in the <br />biological inventory shall be made for a broad <br />range of species to help mitigate the loss of <br />wildlife habitat during construction. Examples <br />
The URL can be used to link to this page
Your browser does not support the video tag.