Browse
Search
OUTBoard Agenda Packet - 042121
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 042121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 7:12:55 PM
Creation date
4/13/2021 3:21:25 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard Minutes - 042121
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
79 <br /> ORANGE COUNTY <br /> ORANGE UNIFIED TRANSPORTATION BOARD <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: April 21, 2021 <br /> Action Agenda <br /> Item No. 4.d. <br /> SUBJECT: Small Non-STIP Transportation Projects <br /> DEPARTMENT: Planning and Inspections <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Summary of NCDOT Non-STIP Funding Nishith Trivedi, Transportation Planner, 919- <br /> Sources for Transportation Improvements 245-2582 <br /> 2. Small Transportation Projects <br /> PURPOSE: Biannual opportunity for OUTBoard members to submit suggestions for North <br /> Carolina Department of Transportation (NCDOT) non-Strategic Transportation Improvement <br /> Program (STIP) projects. <br /> BACKGROUND: NCDOT has a variety of non-STIP funding sources for small transportation <br /> projects (Attachment 1). Such programs include: <br /> • High Impact-Low Cost Program <br /> • Spot Safety <br /> • Hazard Elimination Program <br /> • Spot Mobility Program. <br /> • Annual Maintenance Resurfacing <br /> Common characteristics of these local non-STIP projects are: <br /> • Do not involve right-of-way acquisition; <br /> • Construction ready to be under contract within 24 months of approved funding; <br /> • Costs over $250,000 typically requires resolution of support from local elected body; <br /> • Funding can be paired with other funding sources; and <br /> • Subject to Board of Transportation (BOT) approval. <br /> Throughout each fiscal year, opportunities may arise for Orange County to submit small <br /> transportation projects to NCDOT. The turn-around time between local submission and <br /> NCDOT project review is typically very short. Once non-STIP projects are approved, there is <br /> very little design review or public involvement as these are typically considered "construction <br /> ready." The small transportation project lists as an ongoing inventory addressing the County's <br /> small and immediate transportation issues. <br /> The Planning staff is requesting OUTBoard members assist staff in identifying potential local <br /> non-STIP projects, using the examples provided in Attachment 1 as a reference. OUTBoard <br /> members represent and reside in all areas of the county, and typically are more familiar with <br />
The URL can be used to link to this page
Your browser does not support the video tag.