Orange County NC Website
DraftMPO Board 03/10/2021 Item 9 78 <br /> Final Document <br /> The consultant will incorporate the solutions into the final US 15-501 Corridor Study conceptual <br /> design. The DCHC MPO staff will make the final changes to the summary report and full report. <br /> The consultant will present the final US 15-501 Corridor Study to the DCHC MPO Board for <br /> approval. <br /> Product <br /> • Consultant will produce: Conceptual design for final US 15-501 Corridor Study <br /> • DCHC MPO will produce: Summary report and final report for US 15-501 <br /> Corridor Study, and Web site support <br /> Page 4 <br />