Orange County NC Website
MPO Board 03/10/2021 Item 9 75 <br /> Draft <br /> US 15-501 Corridor Study <br /> Scope — Summary (version:January 19,2021) <br /> This scope summarizes the tasks and products needed to finish the US 15-501 Corridor Study. <br /> Staff will use this summarized scope to create a request for proposal to select a consultant <br /> known for their creative bicycle, pedestrian and transit planning solutions. The request for <br /> proposal will emphasize that the DCHC MPO seeks solutions for the US 15-501 Corridor that are <br /> truly aspirational and lead the travel of our future rather than react to it. <br /> Review Draft Corridor Study and Process <br /> The consultant will become familiar with the draft US 15-501 Corridor Study report, including <br /> the vision and goals, demographic and travel profiles, public participation process, alternatives, <br /> recommendations and implementation, and the conceptual design. It is important that the <br /> consultant understand how the Study's proposed transportation system for the Chapel Hill <br /> segment and the 1-40/US 15-501 quadrant area did not meet the newly adopted Goals and <br /> Objectives of the DCHC MPO and the interests of several people who provided comments to <br /> the Board. The proposed design of the Chapel Hill segment favored vehicle travel over that of <br /> bicyclists and pedestrians, and included an 8-lane cross-section and Reduced Conflict <br /> Intersection (RCI) that would make bicycle and pedestrian crossing hazardous. The sole <br /> interchange proposed for the 1-40/US 15-501 quadrant was viewed as providing inadequate <br /> access to the Patterson Place and New Hope Commons developments, and as making bicycle <br /> and pedestrian movement hazardous between the developments. <br /> The consultant will review segment 1 (i.e., Chapel Hill) and the 1-40/US 15-501 quadrant area <br /> because these two areas need further public input, technical analysis, and development to <br /> create a Corridor Study that can be adopted. Segments 2, 3, and 4 will also require review and <br /> further development, but the level of effort in these segments is not expected to be as high as <br /> segment 1 and the 1-40/US 15-501 quadrant area. <br /> The consultant will conduct an informational meeting with the Project Steering Committee to <br /> identify and understand the unresolved issues in the draft Corridor Study report, conceptual <br /> design, and process. The Project Steering Committee is composed of staff from the DCHC MPO, <br /> Town of Chapel Hill, City of Durham, Durham County, GoTriangle, GoDurham, and NCDOT who <br /> were involved in the US 15-501 Corridor Study. <br /> Product <br /> • DCHC MPO will produce: A compilation of the comments received on the draft <br /> US 15-501 Corridor Study and staff responses to the comments, which identifies <br /> Page 1 <br />