Browse
Search
OUTBoard Agenda Packet - 042121
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 042121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 7:12:55 PM
Creation date
4/13/2021 3:21:25 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard Minutes - 042121
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70 <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> Segment 2 <br /> ► Grade separate Mt Moriah Road and provide ► Provide bicycle and pedestrian connections <br /> bicycle and pedestrian facilities on bridge throughout Segment 2, both along and <br /> ► Urban interchanges at SW Durham Drive across US 15-501 <br /> and Garrett Road ► Provide multimodal connectivity between <br /> Implement Patterson Place and New Hope Sandy Creek Drive, Chapel Hill Blvd Service <br /> Commons local street network Road,and Garrett Road <br /> Segment 2 conceptual cross section <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> Segment 3 <br /> ► Reduce the footprint of the current cross- ► Implement better street connectivity(future <br /> section to implement a fully multimodal focus on an urban grid system) to the north <br /> 4-lane urban cross-section with landscaped and south of US 15-501 Business <br /> median <br /> ► Redesign Academy Road and Chapel Hill <br /> ► Add roundabouts at key locations to Road interchange to better reflect urban <br /> improve connectivity and to further slow design <br /> traffic and create a more urban environment <br /> Segment 3 conceptual cross section <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.