Orange County NC Website
67 <br /> Durham-Orange Light Rail Transit (D-O LRT) <br /> ► Prior to the completion of this study, a decision was made by the <br /> governing bodies to discontinue work on D-O LRT. <br /> ► The Project Steering Committee and MPO Board directed the Project <br /> Team to develop a third alternative that could help achieve the goal of <br /> linking Chapel Hill and Durham with fast,frequent,and reliable transit <br /> service. <br /> ► Alternative 3 mirrors Alternative 2 in every way except for the addition <br /> of dedicated bus lanes within the study area between Ephesus Church <br /> Road and the US 15-501 Bypass. <br /> r - - - - - - - - - - - - - 1 <br /> I I <br /> The purpose of the second 1 0'U515-501 SEGMENT THREE STPATEC,ES <br /> s,sso, <br /> public meeting was to <br /> allow the public to review I �, <br /> and comment on proposed <br />_ _ I concepts for addressing <br /> future transportation I l <br /> challenges. This meeting I ` <br /> 1 helped guide the project 1 <br /> team in selecting concepts <br /> to be studied in detail. <br /> I I L <br /> I <br /> r — — — — — — — — — — — — - - <br /> The purpose of the third <br /> public meeting was to I _ <br /> allow the public to review <br /> the final three proposed <br /> recommendations <br /> for addressing future I �. <br /> transportation challenges. <br /> 1 This meeting helped <br /> guide the project team in I _- <br /> 1 selecting the final preferred <br /> alternative for the study. <br /> L - - - - - - - - - - - - - <br /> J �, .; <br />