Browse
Search
Agenda - 04-06-2021; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 04-06-2021 Virtual Business Meeting
>
Agenda - 04-06-2021; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 3:33:17 PM
Creation date
3/31/2021 3:11:34 PM
Metadata
Fields
Template:
BOCC
Date
4/6/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for April 6, 2021 Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 04-06-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35 <br /> The 203 Project-- Board Action <br /> • Approve one or more of the 20 Greensboro Street Project <br /> options outirned above.eliminate a projected 51,607,160 <br /> project deficit. <br /> • IPnecessaty,authorize staff to present a budget amendment at <br /> an upcoming meeting to effectuate the changes. <br /> 1 <br /> 2 <br /> 3 Commissioner Fowler referred to parking, and asked if these numbers were reached <br /> 4 through discussions with the construction manager. She said if the first twenty spaces are <br /> 5 removed, it adjusts the cost by $400,000, but removing the next 20 adjusts the cost by <br /> 6 $780,000. She asked if there is a reason for this difference. <br /> 7 Travis Myren said removing spots in increments of 40 adjusts the building's core and the <br /> 8 elevator would not have to go up as far. He said this adjusts the building's infrastructure. <br /> 9 Chair Price referred to the Justice Center generator, and asked if the impacts of deleting <br /> 10 this could be identified. <br /> 11 Travis Myren said the Sheriff's department is the only area of the Justice Center with an <br /> 12 emergency generator. He said if the power is out, court cannot meet until power is restored. <br /> 13 He said the new Clerk of Court requested the generator. <br /> 14 Commissioner Dorosin said he is most in favor of the last option, with offsetting capital <br /> 15 costs, and reduced incremental debt service by $85,000 a year. He said the County is currently <br /> 16 giving over$568,000 to Chapel Hill Library. He said if$85,000 is taken out of this funding, it <br /> 17 would cover the debt service increase. He said the money would still be related to library <br /> 18 services. He said does not want to cut the library or reduce the parking. He said reusing <br /> 19 fixtures and furniture from buildings and centers that will be vacated will reduce costs. <br /> 20 Commissioner McKee asked for clarification on differences between the approved <br /> 21 budget for the project, and the new costs for the schematic design. <br /> 22 Travis Myren reviewed them. <br /> 23 Commissioner McKee confirmed the combined cost for Carrboro and Chapel Hill, and <br /> 24 said Orange County would fund over half of the costs. <br /> 25 Commissioner McKee asked if the $2 million change is a result of the new schematic <br /> 26 design, and has come into play since last spring. <br /> 27 Travis Myren confirmed, and said this came into play in November 2020. <br /> 28 Commissioner McKee said he is concerned that the difference between pre-fabricated <br /> 29 versus poured in place was not known earlier in the design process. He said this seems like an <br /> 30 obvious factor to consider. He said the costs have been escalating, and he expects this to <br /> 31 continue. <br /> 32 Travis Myren said the guaranteed maximum price will be known in late September. <br /> 33 Commissioner McKee said the price could increase between now and September. <br /> 34 Travis Myren said yes, that is possible. <br /> 35 Commissioner McKee asked if there is a reason the BOCC is looking at this now before <br /> 36 the start of the budget process. He said he does not think it is financially responsible to borrow <br /> 37 even more money. <br /> 38 Commissioner McKee said he is not interested in building a shell building, and the <br /> 39 proposed savings is not that great, given the importance of the project. <br /> 40 Commissioner Greene said the reason the BOCC is looking at this tonight is because <br /> 41 Carrboro has to get approval from the Local Government Commission (LGC) for their funding <br /> 42 process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.