Orange County NC Website
B. Roads and Aces <br />1. Contain Way shall be constructed m srandards of the Nonh Carolina <br />Department of Transportation, within a 50 -0. right -of -way with 5 -fl. utility <br />easements on each side, and the construction shall be inspeclefl and approved by <br />NCDOT. The portion of Lot E owed by the applicant shall be included in the <br />dedication. <br />5P7 <br />A lever of credit, escrow agreement, or bond shall be submitted to secure <br />convention of Cannon Way in the standards of die North Carolina Department <br />of Transportation. An estimate of the construction not must be prepared by a <br />certified /licensed engineer or grading contractor and submiued in the Planning <br />cast Inspections Department and approved by the County Engineer. The <br />wnswetidn estimate must include a 10% contingency hour. The Townsend <br />guarantee must reficet 110% of that estimate and he issued by an accrsditd <br />financial institution Unsound in do business in Noah Combat. <br />The document desmibing development restrictions in be awarded with the Pied <br />Plat shall state that the f ial guarantee will out bas releasd until the road <br />construction has be® inspend and approved by NCDOT. <br />2, Bordeleau Drive shall be mnmvmd to Class B private road standards within a <br />50 -fl. rightof -way. Rod coostuction drawings shall be submitted to the <br />Erosion Control Division in the planning Depatmem and approved prior to <br />signatures an the Final Plat. <br />Bordeleau Drive shall be inspected, and the constvcion certified th writing m <br />the Orange County Planning Department by a North Carolina professional <br />Eagincer. The Invasion of the travelway, within the plWW private road right -of- <br />way shall also be certified. Erosion Control shell inspect the wustruction to <br />verify the private read standards have been met. <br />A lever of credit, escrow agreement or bond shall be submitted to secure <br />construction <br />anal inspection of Bodeleao Drive to Class B private roust <br />standards. An estimate of the construction ad certification costs must be <br />prepard by a certifid/licensd engineer or grading contractor and mbmined to <br />the Planning tad Inspections Department. The construction estimate must <br />Include a l0% contingency factor. The financial goaront« must reflect 110% <br />of that estimate and be issued by an accredited financial institution licen.cd in do <br />business in North Carolina. <br />The document des eribing development Teseictmns to be recorded with the Food <br />Plat shall state that the broadcast guarantee will not be released until the road <br />construction has been certified by a Nona Carolina Professional Engineer. <br />