CONSTRUCTION SEQUENCE: <br /> m <br /> 1. WINTERISPRING 2021 START <br /> 2. OBTAIN ALL THE APPROVALS AND PERMITS NECESSARY TO BEGIN AND COMPLETE THE PROJECT THESE APPROVALS AND PERMITS INCLUDE BUT ARE NOT LIMITED TO THE �''�'' � �%� � .;,� �� i a� �'£ ,/ �'.� �•' ;�;, /c <br /> EX.PHASE lij NO SURVEYED,, & <br /> FOLLOWING: APPROVAL OF SITE DESIGN,ZONING,ETC.;APPROVAL OF DESIGNS FOR STREETS,UTILITIES,ETC.;EROSION CONTROL PLAN APPROVAL AND GRADING PERMIT- <br /> ZONING COMPLIANCE PERMIT,•DRIVEWAY PERMIT FROM NCDOT. THE APPROVALS MUST BE OBTAINED BEFORE THE DISTURBANCE BEGINS SO THAT WORK WILL NOT BE PER PREVIOUSLYA PROVED <br /> R, <br /> SUP D A WINGS(S E SHEET <br /> INTERRUPTED DUE TO LACK OF APPROVED PLANS. flf,012 I !Z-'1&1, 02. 1"4Z5 <br /> C-1.2 r R OVERALL VIEW/PLAN r- C <br /> �/z <br /> 3. SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWA TER PERMIT CONSTRUCTION ACTIVITY(NCG010000) TO STORMWATER INSPECTIONS <br /> WE 3 INVES EN LLC <br /> THROUGHOUT THE PROJECT. NX -A! <br /> PIN. 4"4A <br /> 4. SCHEDULE AND HOLD A PRECONSTRUCTION CONFERENCE BEFORE STARTING ANY DEMOLITION, TIMBERING,CLEARING,OR GRADING WITH THE OWNER(OR <br /> 09 M TS 1246642 <br /> �;N .00 <br /> ,� � 7 a <br /> JURISDICTION:ORANGE UNTY i% GO <br /> REPRESENTATIVE), THE CONTRACTOR(S)RESPONSIBLE FOR THE DISTURBANCE AND EROSION CONTROL,AND STORMWATER INSPECTIONS REGIONAL COORDINATOR A T ZONI G.-AR 0 iryr <br /> (979)279-7308 TO DISCUSS THE PROJECT AND THE EROSION CONTROL PLAN. • <br /> S. LOCATE A JOB-SITEIINSPECTION BOX IN A SECURE PLACE ON SITE TO HOUSE THE GRADING PERMIT AND APPROVED EROSION CONTROL PLAN AND TO PROVIDE A PLACE FOR USE:RA E TRACK 6�_p <br /> INSPECTORS TO LEAVE INSPECTION REPORTS, COMPLIANCE NOTICES,ETC. SITE PERSONNEL SHOULD CHECK THE BOX DAILY FOR THIS CORRESPONDENCE. 79.88 CRES MIX <br /> 6. INSTALL SILT FENCE,SILT FENCE OUTLETS AND THE GRAVEL CONSTRUCTION EXIT AS SHOWN ON THE PLANS.AS NOTED,CONTRACTOR SHALL INSTALL ADDITIONAL OUTLETS <br /> AS NEEDED WHERE LOW AREAS EXIST OR DEVELOPED SITE CONDITIONS CREATE PLACE FOR SITE RUNOFF TO COLLECT/POND.CLEAR ONLY AS NEEDED FOR THESE MEASURES. <br /> 7 CALL THE RAPID RESPONSE NUMBER(979)857-4472 TO SCHEDULE A STORMWA TER SITE INSPECTION. :4 <br /> 8. UPON APPROVAL,BEGIN CLEARING AND DEMOLITION ACTIVITIES AS SHOWN. 94 <br /> 9. BEGIN EARTHWORK AND EXCAVATION ACTIVITIES TO ACHIEVE THE FOUNDATION GRADES AS SOON AS POSSIBLE. <br /> 70. ALL EROSION CONTROL MEASURE SHALL BE INSPECTED AND MAINTAINED,IF NEEDED,AT LEAST ONCE PER WEEKAND AFTER EVERY RAINFALL EVENT. / PORTION OF FENCE TO BE <br /> 11. TEMPORARY SEED AND MULCH ALL AREAS DISTURBED WITHIN MIN.REQUIRED TIMEFRAME.SEE TEMPORARY SEEDING SCHEDULE AND STABILIZATION CHART REMOVED FOR fN C 0 <br /> 72. INSPECT AND MAINTAIN THE EROSION CONTROL DEVICES SO THEY CONTINUE TO FUNCTION PROPERLY. REFER TO THE EROSION CONTROL DETAILS FOR SPECIFIC \ TRAN E T <br /> PROPOSED SITE , <br /> INSTRUCTIONS FOR EACH DEVICE. THE PERSON RESPONSIBLE FOR EROSION CONTROL IS ALSO RESPONSIBLE FOR TAKING THE INITIATIVE IN INSPECTING AND MAINTAINING �� �\ / / <br /> -DO NOT WAIT FOR THE EROSION CONTROL INSPECTOR TO POINT OUT THE NEED FOR MAINTENANCE REPAIRS. KEEP MUD AND DEBRIS OFF THE PUBLIC / \ <br /> THESE DEVICES, <br /> STREET ATALL TIMES.IF MUD OR DEBRIS IS TRACKED FROM THE SITE, USE SHOVEL AND BROOM TO REMOVE IT IMMEDIATELY. ---- \ \ \ \ <br /> - <br /> 13. IF IT IS DETERMINED DURING THE COURSE OF CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE DESPITE PROPER IMPLEMENTATION AND MAINTENANCE OF <br /> THE APPROVED EROSION CONTROL PLAN, THE PERSON RESPONSIBLE FOR THE LAND-DISTURBING ACTIVITY IS OBLIGATED TO TAKE ADDITIONAL PROTECTIVE ACTION AND <br /> NOTIFY ENGINEER OF THE NEED FOR ADDITIONAL MEASURES. <br /> 14. ONCE SITE GRADING IS COMPLETE,REMOVE CONSTRUCTION ENTRANCE IF LOCATED IN THE DRIVE LOCATIONS AND INSTALL SIDEWALKS AND CURB/GUTTER IN ALL <br /> PERMANENT DRIVES SO THAT THEY CAN BE STABILIZED WITH STONE BASE. _j U <br /> 15. PLACE TOPSOIL AND PERMANENTLY SEED OR OTHERWISE STABILIZE THE REMAINING LANDSCAPED AREAS PER THE PLANS. <br /> 76. SITE STABILIZATION IS REQUIRED PRIOR TO FINAL APPROVAL OF GRADING PERMIT AND ISSUANCE OF CERTIFICATE OF OCCUPANCY. GRASS UTILIZED AS PERMANENT GROUND <br /> COVER MUST BE AT A MOWABLE HEIGHT THAT GENERALLY PROVIDES AT LEAST 80%COVERAGE THROUGHOUT THE SITE, WITH NO LARGE BARE PATCHES OR EVIDENCE OF FLAT RIVERILITILE z <br /> EROSION. RIVER WATERSHED LD <br /> 77. ONCE ALL AREAS ARE STABILIZED, CALL RAPID RESPONSE NUMBER(979)857-4472 FOR FINAL INSPECTION AND APPROVAL TO REMOVE SILT FENCE AND OTHER REMAINING MICHAEL R AMMONSINE \ \PIN:0970738063 <br /> EROSION CONTROL MEASURES. JURISDICTION:ORANGE COUNTY L9 1* to <br /> ZONING:AR&EC5 LU <br /> LA W <br /> 7.17 ACRES 78. WINTER/SPRING 2022 END <br /> r <br /> USE:SINGLE FAMILY RESIDENTIAL <br /> _j W <br /> L901 <br /> 2 ly z a) qj <br /> tn U <br /> El W <br /> °°a h/;; SET BA K <br /> ROUG MONT STORAGE CE TER LLC <br /> rn <br /> EX.PROPERTY L PIN:0910237159 <br /> do CA JURIq DICTION:ORANGE C UNTY rn Lri <br /> I ca @)[4 <br /> 70NING:REDI&AR <br /> E:SELF STROAGE FACILITY U <br /> 79.55ACRES U <br /> To Ut 0_1 z cc W (3) <br /> EXISTING POND <br /> NOT FOR <br /> j J � ` <br /> �\ / oz- r- <br /> 6 4 <br /> WOODED AREA TO REMAIN <br /> ±31450 SF kXgTING <br /> LD <br /> '/�� / °° O —rRTU_T( W CONSTRUCTION <br /> CLEARED <br /> / o�g7 <br /> CS <br /> RIGHT-OF-WAY <br /> Ul <br /> r-r <br /> 1 .00 WOODED AREA TO REMAIN <br /> ro <br /> EXISTING TREEL E <br /> --------------- <br /> ------------- <br /> \-0 Ln <br /> \ Z C� <br /> OHE 0 LU c' 'v- _0HE— OHE— <br /> Ln Z C; iz OH HEI <br /> , 0 m Ln <br /> ------------------- 3� Z, <br /> I---------- LLJ <br /> --------- ------------------------------------------------------ ------------------------- <br /> ----------- <br /> ------------------------------------------------------------ ------------- <br /> -------------- <br /> ----------------------------------- ----------- <br /> ROPERTY LINE <br /> RIGHT-OF-WAY ODED AREA 0 REMAIN <br /> ---------- ------------- ----------- <br /> ;;' ;% / <br /> ------------- <br /> 0 <br /> KENNETH F&NANCY W WALLACE <br /> PIN.0910220465 IV6 <br /> JURISDICTION:ORANGE COUNTY <br /> ZONING:AR ---------------------------- ---------- ----------- <br /> USE:SINGLE FAMILY RESIDENTIAL ------------ <br /> 2.68 ACRES <br /> --------------------- --- <br /> C15 ------- C11 <br /> ---------- ----------------------------------- -- ----------- <br /> ---- -------------- ------------------------------ ------------- <br /> In <br /> --- ------------- N <br /> --------------------------------------------------------------------- <br /> F- Q2 <br /> ------------------ --------- ---- ----------------- <br /> _\-------------------------- <br /> ------------------------ <br /> PIN:0910223106 ------------- -------------------- --------------------------------------------------- -------------- ---- 0 <br /> MICHAEL LUCINDA I DAVIS C <br /> LEONARD H MANGUM -------- <br /> PIN.\O 7 U <br /> JURISDICTION:ORANGE COUNTY <br /> ZONING:AR --------- ----------------------- JURISDICTION COUNTY\ <br /> USE:VACANT ------------ <br /> m --------- --- ZONING:AR <br /> 18.54 ACRES ------------ <br /> USE:VACANT <br /> 7.86AVES <br /> o � �C O <br /> Un <br /> Q <br /> LIU, <br /> BACON ROAD U w A <br /> (60' PUBLIC ROW - SR 1531) C3 PROJECT#: <br /> 18-079 <br /> • REVIEW PROJECT 9: <br /> 0 <br /> GRAPHIC SCALE <br /> NIA20-0001 <br /> co 20 0 10 20 40 80 <br /> SHEET <br /> co <br /> CONSTRUCTION <br /> W <br /> 0 F <br /> N 8 <br /> 0 <br /> IN <br /> T FOLLOWING: <br /> A L <br /> E <br /> I <br /> 0 <br /> V <br /> ZONING <br /> INTERRUPTED F3B <br /> - SUBMIT <br /> THROUGHOUT <br /> 4. SCHEDULE <br /> REPRES� <br /> (979) , <br /> 27� <br /> DISTURBED AREA: ±50,000 SF 0.15 AC) Know what's below. (IN FEET) <br /> 0 7 inch = 40 ft. <br /> Call before you dig. <br /> Z <br />