Browse
Search
Planning Board - 010621
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2021
>
Planning Board - 010621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:26 PM
Creation date
3/29/2021 12:12:25 PM
Metadata
Fields
Template:
BOCC
Date
1/6/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Planning Board - 010621 Site Plan (Separate Cover)
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2021
Planning Board minutes - 010621
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
90 <br /> ➢ Determine consistency with the adopted Comprehensive Plan; <br /> ➢ Review and make a determination if the proposal is consistent <br /> with applicable development standards or if proposed 'design <br /> alternatives' are consistent with the spirit/intent of the UDO; <br /> ➢ Recommend imposition of conditions to address potential <br /> impacts; <br /> ➢ Recommend approval/denial of the project based on the <br /> provisions of the UDO and the project's compliance with the <br /> Comprehensive Plan. <br /> • PLANNING BOARD: <br /> ➢ Review the development proposal and ask questions of the <br /> applicant and staff; <br /> ➢ Review/discuss staffs analysis; <br /> ➢ Although not required, the PB often will Receive public comment <br /> on the proposal; <br /> ➢ Make a recommendation on the approval or denial of the <br /> request to the BOCC. <br /> • BOCC: <br /> ➢ Schedule and hold a public hearing to receive the application; <br /> ➢ Hear from the applicant and staff; <br /> ➢ Receive public comment on the proposal; <br /> ➢ Review/discuss the staff and Planning Board's analysis and <br /> recommendation(s); <br /> ➢ Discuss imposition of conditions; <br /> ➢ Approve or deny the request. <br /> 18. How are decisions to approve or deny a CZD made? <br /> The BOCC approves or denies a CZD request based on: <br /> a. The proposals consistency with the adopted Comprehensive Plan; <br /> b. Consistency/compliance with other applicable plans (i.e. small areas <br /> plans, water/sewer infrastructure plans, transportation improvement <br /> plans, etc.); <br /> C. Suitability of proposed development with surrounding properties as <br /> well as the recognized/anticipated development patterns in the area <br /> where the project is located; <br /> d. Compliance with applicable development standards as embodied <br /> within the UDO and/or the appropriateness of proposed 'design <br /> alternatives'; <br /> e. Public comments; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.