Browse
Search
Planning Board - 010621
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2021
>
Planning Board - 010621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:26 PM
Creation date
3/29/2021 12:12:25 PM
Metadata
Fields
Template:
BOCC
Date
1/6/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Planning Board - 010621 Site Plan (Separate Cover)
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2021
Planning Board minutes - 010621
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> Staff has determined the proposed expansion will not impact existing condition(s) <br /> imposed on the project as part of the original 2012 approval. As with all such <br /> projects, the site plan will be reviewed prior to the commencement of development <br /> activity by all County planning partners (i.e. NC DOT, County Fire Marshal, County <br /> Solid Waste, Environmental Health, Building Inspections, Erosion Control/Stormwater, <br /> etc.), presuming the atlas amendment is approved by the BOCC. <br /> Utilities: The project will be served by an on-site well and a spray septic system. <br /> STAFF COMMENT: A condition on the 2012 approval required on-site waste <br /> disposal facilities to be approved by Environmental Health and Building Inspections <br /> prior to the authorization of earth disturbing activities. <br /> Orange County Environmental Health will be involved in the review of the proposed <br /> installation of the new septic system, which is being permitted by the State consistent <br /> with applicable regulations. <br /> Erosion Control/Stormwater Regulations: The applicant has indicated the project will abide by <br /> existing stormwater and erosion control regulations in Sections 6.14 and 6.15 of the UDO <br /> respectively. <br /> STAFF COMMENT: The submitted site plan denotes the location of a new <br /> stormwater control measure (SCM) that will be required for compliance with the <br /> provisions of the UDO. The proposed expansion does not impact any existing <br /> conditions associated with the 2012 approval as it relates to stormwater management. <br /> Solid Waste: The applicant has indicated development within the project shall abide by the <br /> Orange County Solid Waste Management Ordinance. <br /> STAFF COMMENT: OC Solid Waste staff has indicated they have no concerns over <br /> the proposed expansion. <br /> Land Use Buffers: The applicant is proposing a 20' Type A land use buffer along NC 57 and <br /> Bacon Road. The applicant is also proposing a 10' land use buffer along the eastern property <br /> line adjoining the Argos Ready Mix cement mixing operation. For greater detail, please refer to <br /> the Landscape Plan (sheet C-1.5) in the Site Plan Under Separate Cover. <br /> STAFF COMMENT: The proposed buffers are consistent with the original Conditional <br /> Zoning District approval from 2012. The applicant will be required to maintain these <br /> buffers consistent with Section 6.8 Landscaping, Buffers & Tree Protection. <br /> Environmental Assessment (EA): Per Section 6.16.2 (A) of the UDO, the application was <br /> exempt from the Environmental Assessment (EA) requirement because the development area <br /> for the project is less than two acres. <br /> Analysis: As required under Section 2.9.2 (E) of the UDO, the Planning Director is required to: <br /> `cause an analysis to be made of the application' and pass that analysis on to the reviewing <br /> body. In analyzing this request, the Planning Director offers the following: <br /> 1. The application is complete in accordance with the requirements of Section 2.9.2 (C) of <br /> the UDO; <br /> 2. The proposal appears consistent with the various goals outlined within the <br /> Comprehensive Plan concerning development, including: <br />
The URL can be used to link to this page
Your browser does not support the video tag.