Browse
Search
Planning Board - 040721
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2021
>
Planning Board - 040721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:15:11 PM
Creation date
3/29/2021 12:06:19 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Planning Board minutes - 040721
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures 84 <br /> Section 2.15: Major Subdivisions <br /> (3) All interested persons shall be given the opportunity to speak and ask questions <br /> regarding the application at a F8gWaFly GGh8dUledbusinesS meeting. The Board <br /> of County Commissioners may place reasonable and fair limitations on <br /> comments, arguments and questions to avoid undue delay. The Board of <br /> Commissioners shall base its action on its findings of conformity with all <br /> applicable regulations and shall: <br /> (a) Approve the application; <br /> (b) Approve the application with conditions; or <br /> (c) Deny the application. <br /> (4) If the Board of County Commissioners approves the application with conditions, <br /> such conditions shall be reasonable and shall seek to insure ensure compliance <br /> with applicable regulations and the provision of utilities and/or other facilities <br /> needed to serve the proposed development. <br /> (5) If the Board of County Commissioners approves the application with conditions <br /> or denies the application, the reasons for such decision shall be stated in writing <br /> to the applicant and entered into the minutes of the meeting at which such action <br /> was taken. <br /> (6) The Board of County Commissioners shall also take action on the Resolution of <br /> Approval. <br /> (F) Actions Subsequent to Approval <br /> (1) Upon approval of the Preliminary Plat by the Board of County Commissioners, <br /> the subdivider may proceed with the preparation of the Final Plat, and the <br /> installation of or arrangement for required improvements in accordance with the <br /> approved Preliminary Plat and the requirements of this Ordinance. <br /> (2) If the application is approved or approved with conditions, the Planning Director <br /> may issue applicable development permits required to construct, install, and use <br /> improvements approved as part of the Preliminary Plat approval. <br /> (3) No building permits shall be issued to develop any lot or parcel shown on the <br /> approved Preliminary Plat until a Final Plat showing such lot or parcel is <br /> approved and recorded in compliance with Section 2.15.4. <br /> (4) If the applicant proposes to substantially amend or modify his/her application <br /> Preliminary Plat after the Board of County Commissioners have has approved <br /> the Preliminary Plat, the applicant shall submit an amended application for review <br /> as a new application. <br /> (5) The approval of a Preliminary Plat shall be effective for a period of one year from <br /> the date of approval by the Board of County Commissioners. By the end of said <br /> time period, approval of the Final Plat must have been obtained from the <br /> Planning Director, although the plat need not have been recorded in the Office of <br /> the Register of Deeds. <br /> (6) Any plat or portion thereof not receiving final plat approval within the time period <br /> set forth in (5) above shall be null and void except under the following conditions: <br /> (a) The subdivision is built in sections or phases, and a phasing plan was <br /> approved as part of the Preliminary Plat; <br /> (b) The period between the approval date of the Preliminary Plat and the <br /> approval date of the Final Plat for the first phase does not exceed one <br /> year; and <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.